a new single storey side extension to existing single storey dwelling house including internal alterations, new wastewater treatment plant and raised polishing filter, elevational changes consisting of new roof windows to existing roof and all associated site works. Significant further information/revised plans submitted on this application
Development Address:
Balloy & Lisdornan, Stamullen, Co. Meath
Architect Name:
Location Key:
BALLOY
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Matthew O'Connor
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
11/04/2024
Manager Order:
506/24
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
a new single storey side extension to existing single storey dwelling house including internal alterations, new wastewater treatment plant and raised polishing filter, elevational changes consisting of new roof windows to existing roof and all associated site works. Significant further information/revised plans submitted on this application
for development at Silverstream Priory within the townland of Balloy, Stamullen, Co. Meath. The development will consist of the conversion and extension of the existing cow shed and storage shed to create a single storey oratory and associated elements with new roof above and alterations to all elevations in the form of new opes and 4 no. small extensions off all elevations to create an entrance porch to south-west; confessional box to south; new porch and disabled toilets to north-east, and new disabled access, porch and toilet to north. The new oratory will connect at ground floor with the existing courtyard building through the creation of a new ope at ground floor that will connect in a Cowl Room that will connect via new internal ope into a new hall and office. A new external door will open from this hall on the east elevation of the courtyard building. A dormer window will also be relocated at roof level of the courtyard building and new internal ope created from bedroom at first floor level within the courtyard building into the oratory. The application will also include a new sewerage treatment system to serve the entire Priory
development will consist of the creation of a new cloister within the existing courtyard building to the west of the house by the closing off of the courtyard by the creation of an extension between the courtyard office and main house and the creation of a new cloister with new roof over glazed walkway around the inside of the new and extended courtyard building. The development will also include the retention of the thirteen dormer windows at roof level to all external elevations of the roof of the courtyard building as well as the retention of the single storey energy centre (47.6sqm) that has been constructed to the rear. The application is made concurrently with Planning Ref. AA161308
No Environment Impact Assesments Associated with this Application