The development will consist of the importation and insertion of c.143,826 tonnes of uncontaminated soil and stone as a non-waste by product over a six year period, not exceeding 25,000 tonnes/annum, to improve 7.34 hectares of agricultural lands where:
•The further use of the soil and stone is certain and will be used to recontour and improve the agricultural lands;
•The soil and stone can be used directly without further processing.
•The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands.
•The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts.
On site equipment includes:
•Existing site wheel wash;
•Existing mobile portacabin welfare facilities;
•Existing material inspection and quarantine area;
There is no planned removal of hedge line vegetation on the perimeter of the site.
Development Address:
Muff, Nobber, Co. Meath
Architect Name:
Location Key:
MUFF
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Donal Farrelly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
27/03/2024
Manager Order:
422/24
Decision Type:
Conditional
Number of Conditions:
31
Grant Date:
16/05/2024
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
15/05/2029
Decision Description:
The development will consist of the importation and insertion of c.143,826 tonnes of uncontaminated soil and stone as a non-waste by product over a six year period, not exceeding 25,000 tonnes/annum, to improve 7.34 hectares of agricultural lands where:
•The further use of the soil and stone is certain and will be used to recontour and improve the agricultural lands;
•The soil and stone can be used directly without further processing.
•The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands.
•The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts.
On site equipment includes:
•Existing site wheel wash;
•Existing mobile portacabin welfare facilities;
•Existing material inspection and quarantine area;
There is no planned removal of hedge line vegetation on the perimeter of the site.