Planning application details ref: 2560220 Meath CoCo

100%100% Complete (warning)

Planning Application: 2560220 (Meath CoCo)
File Number: 2560220
Application Type: PERMISSION Planning Status: DECISION MADE
Received Date: 05/03/2025 Decision Due Date: 29/04/2025
Validated Date: 05/03/2025 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 28/04/2025
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 08/04/2025

Applicant Details

Applicant name: Uisce Éireann c/o Conor Delaney
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: 10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application
Development Address: Navan Wastewater Treatment Works, Ferganstown and Ballymacon, Boyne Road, C15 N927
Architect Name: Location Key: FERGANSTOWN + BALLYM
Electoral Division: Planner: Nathan Cooney
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: Yes
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 28/04/2025 Manager Order: 720/25
Decision Type: Conditional Number of Conditions: 13
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: 10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: