retention permission (items 1-8) & permission (item no. 9) for development consisting of:- 1). 5 No. Mushroom Tunnels numbered 11-15. 2) Extension to building previously granted as a workshop under planning file ref. no. 89/1394. 3) Machine / packaging store, 4) Extension to office previously granted under planning file ref. no. 89/1394. 5) Boiler / pump house, water tank house. 6) Replacement of septic tank previously granted under planning file ref. no. 89/1394 with biocycle wastewater treatment system & relocation of same. 7) Extension to canteen previously granted as an ancillaery building under planning file ref no. 89/1394. 8) Revised site boundary including all associated ancillary works. 9) Permission for 5 no. mushroom tunnels numbered 16-20. Significant further information/revised plans submitted for this application
1. Permission for alterations to rear of 11 no. mushroom tunnels numbered 5-15 to facilitate enclosed walkway; 2. Permission for enclosed walkway from packhouse along the rear of existing mushroom tunnels nos. 5-15 and connecting to enclosed walkway at the rear of mushroom tunnel no. 16; 3. Permission to modify and improve existing farm entrance; 4. Retention of variations to mushroom tunnels nos. 16-20 & the minor re-location of same. Also permission for further alterations to these tunnels & for retention & completion of enclosed walkway to the rear of the tunnels; 5. Retention permission for wood chip boiler house and associated fuel storage area
No Environment Impact Assesments Associated with this Application