the amendment of the permitted residential development of 205 no. units ( Meath County Council Reg Ref AA/170505, which itself amended SA/900975( ABP Ref PL17.237144) on a site of c.9 ha. Phase 1 comprises of a total of 81 no. units and was approved as part of the overall permission under Meath County Council Reg Ref AA/170505, some 51 no. units of which are currently under construction/constructed. There is a concurrent application lodged under review by Meath County Council, Ref AA200833 on a site for Phases 1A, 2 and part of 3, which will provide for the re-configuration and redesign of the approved 30 no. remaining units in Phase 1 yet to be constructed (Phase 1A) and 44no. approved units in Phase 2 to provide a total of 97 no. units. This is an increase of 23 no. units in Phase 1A and Phase 2 compared to the permitted scheme on the site. There is an overlap between the piped infrastructure, road & footpath network & open space for Phase 2 & Phase3 applications. This enables both applications to be constructed independently of the other. The remaining 88no. units (Phase 3) the subject of this application will consist of 18 no. semi detached units(comprising 14no.3bed units & 4 no. 2bed units) & 54no. terraced units (comprising 18 no. 2bed units & 36no. 3bed units)& 16 no. detached units (comprising 2no. 4bed units& 14no. 3bed units).This is an increase of 8no.units in Phase 3 compared to the permitted scheme on the site. For clarity no housing units are proposed for Phase 2 lands under this planning application. This application also provides for a part single, part 2storey crèche of 357sqm. In addition the application will also consist of the provision of the piped infrastructure, road & footpath network & open space provision for both Phase 2 & Phase 3 development lands, reconfiguration of the internal road & layout including potential future pedestrian & road links: amendments to hard & soft landscaping: amendments to drainage infrastructure: boundary treatment works: construction of 1no. ESB sub-station: provision of associated car parking: and all associated works including site excavation, infrastructural & site development works above and below ground.