the continuation of the use and further quarrying of limestone within the 57.5Ha site, granted by Substitute consent (PL17.su0088), comprising extraction from a 20.6Ha area which includes a lateral extension of 6.2Ha, using conventional drilling and blasting techniques and mineral reduction using mobile crushing and screening to a depth of 30mAOD. The development includes some 3.4Ha of advanced woodland planting, new administration office and workshop, associated septic tank with raised sand polishing filter and an oil interceptor with soak-away trench. A weighbridge with an associated dispatch office and ancillary structures to include a wheelwash and the potential in line relocation of 110kv transmission poles and the reuse of the northern void 3.24Ha at a reprofiled level of some 40mAOD using on site overburden to provide for a new low level location for a replacement concrete batching plant for the existing plant (01/4203) and a concrete block making yard with restoration of the lands to biodiverse habitats upon completion of extraction. The application is accompanied by an Environmental Impact Asssessment Report and a Natura Impact Statement. Significant further information/revised plans submitted on this application
Development Address:
Duleek Quarry, Newtown, Duleek, Co. Meath
Architect Name:
Andrew Scurfield
Location Key:
NEWTOWN
Electoral Division:
Planner:
Philip Maguire
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
10/06/2021
Manager Order:
1367/21
Decision Type:
Conditional
Number of Conditions:
23
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
02/03/2041
Decision Description:
the continuation of the use and further quarrying of limestone within the 57.5Ha site, granted by Substitute consent (PL17.su0088), comprising extraction from a 20.6Ha area which includes a lateral extension of 6.2Ha, using conventional drilling and blasting techniques and mineral reduction using mobile crushing and screening to a depth of 30mAOD. The development includes some 3.4Ha of advanced woodland planting, new administration office and workshop, associated septic tank with raised sand polishing filter and an oil interceptor with soak-away trench. A weighbridge with an associated dispatch office and ancillary structures to include a wheelwash and the potential in line relocation of 110kv transmission poles and the reuse of the northern void 3.24Ha at a reprofiled level of some 40mAOD using on site overburden to provide for a new low level location for a replacement concrete batching plant for the existing plant (01/4203) and a concrete block making yard with restoration of the lands to biodiverse habitats upon completion of extraction. The application is accompanied by an Environmental Impact Asssessment Report and a Natura Impact Statement. Significant further information/revised plans submitted on this application
the continuation of the use and further quarrying of limestone within the 57.5Ha site, granted by Substitute consent (PL17.su0088), comprising extraction from a 20.6Ha area which includes a lateral extension of 6.2Ha, using conventional drilling and blasting techniques and mineral reduction using mobile crushing and screening to a depth of 30mAOD. The development includes some 3.4Ha of advanced woodland planting, new administration office and workshop, a weighbridge with an associated dispatch office and ancillary structures to include a wheelwash and the potential in line relocation of 110kv transmission poles and the reuse of the northern void 3.24Ha at a reprofiled level of some 40mAOD using on site overburden to provide for a new low level location for a replacement concrete batching plant for the existing plant (01/4203) and a concrete block making yard with restoration of the lands to biodiverse habitats upon completion of extraction. The application is accompanied by an Environmental Impact Asssessment Report and a Natura Impact Statement
permission for the extension of limestone extraction and permission for retention of limestone extraction and other works consisting of lateral extension of limestone extraction over an area of 8.3ha,the deepening of the existing extraction area from 35m AOD TO 5m AOD,an extension to an existing settlement lagoon (0.25ha)to the south west of the site.The development also includes the retention of 7.1ha of other works including a)an extraction area of 2.7ha b)a stripped area of 2ha c)existing bund of 1.01ha d)silt pond of 0.64ha e)lagoons of 0.74ha and restoration of lands upon completion of extraction and all associated site development works on an overall site area of 30.43ha