construction of a storey and a half extension to the existing dwelling incorporating extending the sitting room at ground level and existing bedroom at dormer level with the addition of one new bedroom ensuite and the construction of a front entrance porch
Development Address:
Bellinter, Navan, Co Meath
Architect Name:
Joseph Beggy
Location Key:
BELLINTER
Electoral Division:
Incorrect Icl Voter Recor
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Significance of further information yet to be determined.
Decision
Decision Date:
29/08/2012
Manager Order:
N920/12
Decision Type:
Conditional
Number of Conditions:
6
Grant Date:
03/10/2012
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
02/10/2017
Decision Description:
construction of a storey and a half extension to the existing dwelling incorporating extending the sitting room at ground level and existing bedroom at dormer level with the addition of one new bedroom ensuite and the construction of a front entrance porch
the development consists of a first floor extension and alterations to an existing dwelling. The alterations include (1) changing the house style from dormer bungalow to a 2 storey dwelling (2) raising the existing roof ridge line and changing the roof style from a dormer style roof to a hipped roof (3) extending the floor area of the first floor (4) altering the window opes on the front, sides and rear elevations (5) widening the existing porch and altering the front door ope along with other alterations and all associated site works
construction of a storey and a half extension to the existing dwelling incorporating extending the sitting room at ground level and existing bedroom at dormer level with the addition of one new bedroom ensuite
No Environment Impact Assesments Associated with this Application