the development will consist of a change of use from a retail unit to a sessional and part-time childcare facility which will operate between 7.00am to 6.00pm, Monday to Friday and cater for up to 21 children with on site car parking. The application also includes the repositioning and widening of the existing entrance onto public road, connecting to all public services & all ancillary site services
Development Address:
Balbradagh, Robinstown, Navan, Co. Meath
Architect Name:
Kevin Mulvey
Location Key:
BALBRADAGH
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Donal Farrelly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
06/04/2016
Manager Order:
N480/16
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
22/08/2021
Decision Description:
the development will consist of a change of use from a retail unit to a sessional and part-time childcare facility which will operate between 7.00am to 6.00pm, Monday to Friday and cater for up to 21 children with on site car parking. The application also includes the repositioning and widening of the existing entrance onto public road, connecting to all public services & all ancillary site services
(a) demolitionh of existing commercial unit and domestic dwelling (b) construct 2 no commercial units, one of which to replace Orlas hair salon (c) 2 no town houses (d) 1 no 2 bed apartment at ground floor (e) 3 no 2 bed apartments at first floor (f)20 car spaces at rear accessed via side entrance (g) de-commission existing septic tank (h) all services conneced to mains (i) all associated site works
a single storey extension to the rear of existing sessional & part-time childcare facility, internal alterations and the increase of child places from 21 to 50 within the existing operating hours of 7.00am to 6.00pm. The application also includes additional car parking spaces on site & all ancillary site works
No Environment Impact Assesments Associated with this Application