Planning application details ref: NA200528 Meath CoCo

100%100% Complete (warning)

Planning Application: NA200528 (Meath CoCo)
File Number: NA200528
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 17/04/2020 Decision Due Date: 18/07/2020
Validated Date: 17/04/2020 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 17/07/2020
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 27/06/2020

Applicant Details

Applicant name: Michael & Ann Collins
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a purpose designed and built 2 story building, to operate as a creche. The creche will consist of 308m2 over two floors. The creche is to have 2 playrooms on the ground floor and 3 playrooms on first floor for older children. The creche includes areas for food preparation, nappy changing, sleeping and sensory area for special needs children. The development includes a separate septic tank & percolation area as designed for the facility. It is proposed that the creche is built at the rear of the new main dwelling house currently under construction
Development Address: Grange Bective, Navan, Co. Meath
Architect Name: Location Key: GRANGE
Electoral Division: Incorrect Icl Voter Recor Planner: Philip Maguire
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: 9 Comments: The dates and timelines on this application may be affected by the Emergency Covid-19 legislation.

Decision

Decision Date: 17/07/2020 Manager Order: R1126/20
Decision Type: Refused Number of Conditions: 4
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: a purpose designed and built 2 story building, to operate as a creche. The creche will consist of 308m2 over two floors. The creche is to have 2 playrooms on the ground floor and 3 playrooms on first floor for older children. The creche includes areas for food preparation, nappy changing, sleeping and sensory area for special needs children. The development includes a separate septic tank & percolation area as designed for the facility. It is proposed that the creche is built at the rear of the new main dwelling house currently under construction

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: