the development will consist of the demolition of the existing two storey dwelling and the construction of a new development of 2 no. residential blocks (Block A and Block B) giving a total of 73 no. Apartments (36 no. 1 beds, 29 no. 2 beds and 8 no. 3 beds), Block A consists of 14 no. 1 beds, 17 no. 2 beds and 8 no. 3 beds from first to fifth floor. Block B consists of 22 no. 1 beds, and 12 no. 2 beds from first to sixth floor. The development will also include all associated car parking at ground floor of Block A and B and surface parking, new vehicular and pedestrian site access, cycle lane, public open space with a new access to the site, landscaping, bin storage, bike storage, signage, ESB substation and all associated site development works including connections to foul and surface water drainage/attenuation and water supply/storage
Development Address:
Aylesbury House, Main Street, Portan, Clonee, Co. Meath
the development will consist of the demolition of the existing two storey dwelling and the construction of a new development of 2 no. residential blocks (Block A and Block B) giving a total of 73 no. Apartments (36 no. 1 beds, 29 no. 2 beds and 8 no. 3 beds), Block A consists of 14 no. 1 beds, 17 no. 2 beds and 8 no. 3 beds from first to fifth floor. Block B consists of 22 no. 1 beds, and 12 no. 2 beds from first to sixth floor. The development will also include all associated car parking at ground floor of Block A and B and surface parking, new vehicular and pedestrian site access, cycle lane, public open space with a new access to the site, landscaping, bin storage, bike storage, signage, ESB substation and all associated site development works including connections to foul and surface water drainage/attenuation and water supply/storage. Significant further information/revised plans submitted on this application
No Environment Impact Assesments Associated with this Application