the construction of a new bay within the existing Gorman substation, a remote substation compound with 2 CCTV Cameras and single security light and associated grid infrastructure, underground cables, permanent access track, temporary access track and flood attenuation pond, to connect to the neighbouring consented Energy Storage Facility (Planning Reference: lb171475) on land at Causetown, Stackallen, Co. Meath
the construction of a new bay within the existing Gorman substation, a remote substation compound with 2 CCTV Cameras and single security light and associated grid infrastructure, underground cables, permanent access track, temporary access track and flood attenuation pond, to connect to the neighbouring consented Energy Storage Facility (Planning Reference: lb171475). Significant further information/revised plans submitted on this application
to build - a new 220kv outdoor substation comprising two 220kv busbars equiped with two 220kv overhead line bays, one 220kv transformer bay and provision for a second transformer, one 220kv and one 110kv coupler bay, one double 110kv busbar comprising four 110kv line bays, one 220/110kv transformer and associated equipment. The outdoor substation will contain a biounit and percolation area. Also included will be a single storey building in the townland of causestown. The new 220kv substation, compound and alterations to the existing access road will be shown on maps submitted with the application along with drawings of typical structures. An Environmental Impact Statement together with any further information relating to the project and any amendments to the original application (SA20083) will be available for inspection or purchase
No Environment Impact Assesments Associated with this Application