Planning application details ref: TA180167 Meath CoCo

100%100% Complete (warning)

Planning Application: TA180167 (Meath CoCo)
File Number: TA180167
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 22/02/2018 Decision Due Date: 18/04/2018
Validated Date: 22/02/2018 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 17/04/2018
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 28/03/2018

Applicant Details

Applicant name: Tom Bruton
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: the development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioning
Development Address: Friarspark 6th Division, Trim, Co. Meath
Architect Name: Location Key: FRIARSPARK 6TH DIV
Electoral Division: Incorrect Icl Voter Recor Planner: Billy Joe Padden
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 17/04/2018 Manager Order: T518/18
Decision Type: Conditional Number of Conditions: 29
Grant Date: 23/05/2018 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 22/05/2028
Decision Description: the development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioning

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: