construction of (i) A new treated water storage tank, (ii) A new weather-proof enclosure to house network pumps and local control panel, (iii) Ancillary development works and (iv) Associated temporary development works, including a temporary compound area for the construction period
construction of (i) A new treated water storage tank, (ii) A new weather-proof enclosure to house network pumps and local control panel, (iii) Ancillary development works and (iv) Associated temporary development works, including a temporary compound area for the construction period
the development will consist of construction of 11 No. Reed Beds measuring 20m (long) by 15m (wide) by 2.0m (high), 2 No. 18.3m (approximate)diameter reinforced concrete Final Settlement Tanks (1,300 m3) with associated access/viewing platform, 1 No. WAS Holding Tank (90m3), 2 No. 60m long Transfer pipelines beneath the bed of the River Blackwater between the new and existing treatment infrastructure, 1 No. Sludge Import facilities, construction of various pump sumps and the installation of duty/standby pumps, 1 No. 2m by 1.5m Box Culvert, new site surface water drainage pipework, sustainable drainage attenuation and manholes, new internal roads, installation of a new 2.4 m high wire mesh boundary fence with lockable access gates, new outfall to the River Blackwater for treated effluent and attenuated surface water runoff, landscaping and reinstatement including tree and hedge planting, localised scour protection and bank repair works to a part of the riverbank, new kerbs and flood defence measures on the existing WwTP site, decommissioning of existing clarifiers and belt press and removal of the Picket Fence Thickener and all ancillary works. Access is via an existing access off the R402. The development is an extension to Enfield WwTP to increase the treatment capacity and has an overall site area of 2.7ha. A Natura Impact Statement accompanies this planning application
No Environment Impact Assesments Associated with this Application