Planning application details ref: aa150613 Meath CoCo

100%100% Complete (warning)

Planning Application: aa150613 (Meath CoCo)
File Number: aa150613
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 16/06/2015 Decision Due Date: 10/08/2015
Validated Date: 16/06/2015 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 07/08/2015
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 20/07/2015

Applicant Details

Applicant name: Primeline Logistics
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: the construction of an extension to our existing warehousing unit at Site 12 Ashbourne Business Park. The extension of 25,968m2 (to the existing building of 10,729m2) will match the existing finishes, building height (max. 16.65m high) and will be constructed in two phases. Phase 1 - Warehouse 12,453m2 adjoined north of the existing unit, office/staff facilities 714m2/10.3m high on 3 floors to the front of Phase 1 warehouse plus 140m2/6.4m high internal two storey docking office to loading area and 51m2 internal single storey WC block to warehouse plus 2 no. ancillary charging areas 568m2/7.65m high to the rear of the existing warehouse. Phase 2 - Warehouse 11,617m2 adjoined north of Phase 1 plus integrated ancillary two storey office/staff facilities 374m2/6.4m high to the north elevation plus 51m2 internal single storey WC block to warehouse. The development will also incorporate the following: relocated car access/egress and widened HGV access/egress to western site boundary, new separate car and HGV acces/egress to northern site boundary all serviced from the existing road network within the estate, additional 274 car parking spaces to facilitate the extension 17.5m2/3.3m high stand alone security kiosk to goods entrance/exit, bicycle shelters, commercial vehicle wash bay, diesel tanks & HGV refuelling point together with services, utilities, landscaping, planting, paving and all associated site development works including drainage incorporating surface water attenuation
Development Address: Site 12 Ashbourne Business Park, Ashbourne, Co. Meath
Architect Name: Kavanagh Burke Location Key: KILLEGLAND
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 07/08/2015 Manager Order: A931/15
Decision Type: Conditional Number of Conditions: 14
Grant Date: 11/09/2015 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 10/09/2020
Decision Description: the construction of an extension to our existing warehousing unit at Site 12 Ashbourne Business Park. The extension of 25,968m2 (to the existing building of 10,729m2) will match the existing finishes, building height (max. 16.65m high) and will be constructed in two phases. Phase 1 - Warehouse 12,453m2 adjoined north of the existing unit, office/staff facilities 714m2/10.3m high on 3 floors to the front of Phase 1 warehouse plus 140m2/6.4m high internal two storey docking office to loading area and 51m2 internal single storey WC block to warehouse plus 2 no. ancillary charging areas 568m2/7.65m high to the rear of the existing warehouse. Phase 2 - Warehouse 11,617m2 adjoined north of Phase 1 plus integrated ancillary two storey office/staff facilities 374m2/6.4m high to the north elevation plus 51m2 internal single storey WC block to warehouse. The development will also incorporate the following: relocated car access/egress and widened HGV access/egress to western site boundary, new separate car and HGV access/egress to northern site boundary all serviced from the existing road network within the estate, additional 274 car parking spaces to facilitate the extension 17.5m2/3.3m high stand alone security kiosk to goods entrance/exit, bicycle shelters, commercial vehicle wash bay, diesel tanks & HGV refuelling point together with services, utilities, landscaping, planting, paving and all associated site development works including drainage incorporating surface water attenuation

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: