the development will consist of a prefabricated demountable structure measuring 1,400sq.m, comprising 14 no. classrooms; 2 no. technology rooms; toilets; social area; office and all associated ancillary & site works at
for the demolition of the Old Convent Buildings and associated storage buildings and associated site works, the provision of infill railings between the existing old stone pillars that formed the original entrance to the convent and revised site boundary for the new school that was granted permission under Planning Ref No. 18/321 at
The Board of Management of Summerhill National School
Crannagh Townland Drum Athlone
Permission to construct a single storey extension to include an additional classroom and 2 No. SET rooms with a link corridor and all associated site development works at
The development will consist of (1) to develop a 4G full size GAA pitch with 1.4m high metal fence surrounding and 2 No. 13m high ball stops. (2) to erect 6 No. 21.34m high poles to provide flood lighting of 350 Lux Standard. (3) To construct a 2m wide walkway around the boundaries of the pitch together with all ancillary siteworks at
No Environment Impact Assesments Associated with this Application