of an office building, site entrance and infill material used to raise site levels and for planning permission to construct a truck wash area with sediment settling tank and soakpit at
Permission for the construction of a storage yard area adjacent to the existing concrete manufacturing facility for storing products. The proposed works will involve lowering the existing ground level to the level of the current manufacturing yard and raising an area of ground extending the manufacturing area and all associated ancillary works at
For the demolition of 2 No. derelict buildings, the construction of a storage yard area involving lowering and raising areas of ground to extend the existing manufacturing and storage areas, the construction of an ESB electricity substation and switch room building and the construction of a concrete batching plant and all associated ancillary works at
for additional works carried out consisting of the removal of excavated material and construction of an extension to the concrete slab granted under planning reference PD/16/411 and all associated ancillary works at
No Environment Impact Assesments Associated with this Application