Planning Application: 133091 (Roscommon County Council )
File Number:
133091
Application Type:
EXTENSION OF DURATION
Planning Status:
APPLICATION FINALISED
Received Date:
14/08/2013
Decision Due Date:
08/10/2013
Validated Date:
14/08/2013
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
20/09/2013
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
17/09/2013
Applicant Details
Applicant name:
Greener Ideas Limited (GIL)
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Extension of Duration of PD/08/451 - For a 100 MW open cycle gas turbine power station with a turbine hall 8.75m high, maintenance bay, exhaust stack 20m high, air vent 20m high, air cooler, water cooler, power control module, main and auxiliary transformers, bunded fuel oil tank 1800m, raw water tank 580m, water treatment module, treated water tank 580m, firewater module, tanker unloading area, office/workshop and associated site development works. This application refers to an activity for which an Integrated Pollution Prevention and Control (IPPC) licence will be applied at
Development Address:
Monksland Townland,, Athlone,, Co. Roscommon.
Architect Name:
Location Key:
MONKSLAND
Electoral Division:
Planner:
Athlone
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
20/09/2013
Manager Order:
Decision Type:
Number of Conditions:
0
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
19/11/2018
Decision Description:
Extension of Duration of PD/08/451 - For a 100 MW open cycle gas turbine power station with a turbine hall 8.75m high, maintenance bay, exhaust stack 20m high, air vent 20m high, air cooler, water cooler, power control module, main and auxiliary transformers, bunded fuel oil tank 1800m, raw water tank 580m, water treatment module, treated water tank 580m, firewater module, tanker unloading area, office/workshop and associated site development works. This application refers to an activity for which an Integrated Pollution Prevention and Control (IPPC) licence will be applied at
For a 100 MW open cycle gas turbine power station with a turbine hall 8.75m high, maintenance bay, exhaust stack 20m high, air vent 20m high, air cooler, water cooler, power control module, main and auxiliary transformers, bunded fuel oil tank 1800m, raw water tank 580m, water treatment module, treated water tank 580m, firewater module, tanker unloading area, office/workshop and associated site development works. This application refers to an activity for which an Integrated Pollution Prevention and Control (IPPC) licence will be applied at
No Environment Impact Assesments Associated with this Application