to construct a utilities and office building, to relocate certain items of external plant and water storage tanks and to carry out all associated site works on the site of their existing premises at
For the development consisting of raising the height of a section of the existing roof, and an extension to the rear of the main production building and associated site works at
permission for development consisting of the construction of an Emissions Abatement Plant System, together with all associated paperwork, steel frame supports and associated site works . (Arran Chemical Company holds an existing Integrated Pollution Prevention Control Licence - IPPC Licence Number P0110-02)at
Permission for the Construction of Stand By Generator approx. 5m x 1.5m x 2.3m high together with all associated site works. Arran Chemical Ltd hold an existing Industrial Emissions Licence - Licence Registeration Number: PO110-02 at
No Environment Impact Assesments Associated with this Application