|
|||
---|---|---|---|
File Number: | 18320 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 28/06/2018 | Decision Due Date: | 22/08/2018 |
Validated Date: | 28/06/2018 | Invalidated Date: | |
Further Info Requested: | Further Info Received: | ||
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 22/08/2018 |
Leave to Appeal: | Appeal Date: | 17/09/2018 | |
Commenced Date: | Submissions By: | 01/08/2018 |
Applicant Details |
|||
---|---|---|---|
Applicant name: | EirGrid Plc., | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | permission for the development at this site, the existing Cloon to Lanesboro 110 kV Overhead Line which is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment of the existing circuit within County Roscommon will be undertaken between structure IMP221 in the townland of Aghagower, south-east of Creggs village (Co. Galway) and structure IMP364 in the townland of Ballyleague. Within County Roscommon, the existing circuit extends across the townlands of Aghagower, Creemully and Aghagad Beg, Muff, Ballinlig (Baile an Loig) (ED Fuerty), Cooly (Cúil Aodha), Lissaneaville (Lios an Neibhíligh), Lissacarrow (Lios na Leathcheathrú), Brackloon (Breac-chluain), Rathbrenan, Ballybride, Carrownabrickna, Ballindall, Bohergarve, Lisnacroghy or Gallowstown, Ranelagh, Barnhill, Roxborough, Cartron (Coote), Ballynacullia, Derryconny, Cartron (Brett), Carrowbaun, Tonlegee (Tóin le Gaoith) (ED Kilteevan), Carrowcrin, Cloontimullan, Coolshaghtena, Clooncashel More, Anrittabeg, Cloonaddra, Moher, Ballyclare, Gortgallan and Ballyleague. The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit (due to technical restraints please refer to file for full description). (A Natura Impact Statement (NIS) forms part of this application) at | ||
Development Address: | Ballyleague, Co. Roscommon | ||
Architect Name: | Location Key: | BALLYLEAGUE, CO. ROSCOMMON | |
Electoral Division: | Roscommon Rural Part of | Planner: | Athlone |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 22/08/2018 | Manager Order: | PL/703/18 |
Decision Type: | Conditional | Number of Conditions: | 7 (Document Size 25 Kb) Download a Free Word viewer |
Grant Date: | Grant Managers Order #: | ||
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 18/03/2024 | ||
Decision Description: | permission for the development at this site, the existing Cloon to Lanesboro 110 kV Overhead Line which is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment of the existing circuit within County Roscommon will be undertaken between structure IMP221 in the townland of Aghagower, south-east of Creggs village (Co. Galway) and structure IMP364 in the townland of Ballyleague. Within County Roscommon, the existing circuit extends across the townlands of Aghagower, Creemully and Aghagad Beg, Muff, Ballinlig (Baile an Loig) (ED Fuerty), Cooly (Cúil Aodha), Lissaneaville (Lios an Neibhíligh), Lissacarrow (Lios na Leathcheathrú), Brackloon (Breac-chluain), Rathbrenan, Ballybride, Carrownabrickna, Ballindall, Bohergarve, Lisnacroghy or Gallowstown, Ranelagh, Barnhill, Roxborough, Cartron (Coote), Ballynacullia, Derryconny, Cartron (Brett), Carrowbaun, Tonlegee (Tóin le Gaoith) (ED Kilteevan), Carrowcrin, Cloontimullan, Coolshaghtena, Clooncashel More, Anrittabeg, Cloonaddra, Moher, Ballyclare, Gortgallan and Ballyleague. The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit (due to technical restraints please refer to file for full description). (A Natura Impact Statement (NIS) forms part of this application) at |
Appeal Details | |||
---|---|---|---|
Notification Date: | 20/09/2018 | BP Reference #: | ABP-302597-18 |
Appeal Type: | THIRD PARTY | File Forward Date: | |
Submission Due Date: | 17/10/2018 | Submission Sent Date: | |
Appeal Decision: | CONDITIONAL | Decision Date: | 19/03/2019 |
Withdrawn Date: | Dismissed Date: | ||
Reason: |