Planning Application: 19396 (Roscommon County Council )
File Number:
19396
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
06/08/2019
Decision Due Date:
07/04/2021
Validated Date:
06/08/2019
Invalidated Date:
Further Info Requested:
27/09/2019
Further Info Received:
17/04/2020
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
07/04/2021
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
24/03/2021
Applicant Details
Applicant name:
ESB Telecoms Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for the construction of a 36 metre high free standing lattice communication structure and its associated antennae, communication dishes and ground equipment within a 2.4 m high palisade fence compound at ESB's existing Flagford 220kV substation at
Development Address:
Townland of Culleenatreen or Flagford, Co. Roscommon
Architect Name:
Location Key:
CULLEENATREEN CARRICK-ON-SHANNON.
Electoral Division:
Boyle Rural Part of
Planner:
North Roscommon
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
07/04/2021
Manager Order:
Decision Type:
Conditional
Number of Conditions:
8
Grant Date:
12/05/2021
Grant Managers Order #:
PL/370/21
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
11/05/2026
Decision Description:
for the construction of a 36 metre high free standing lattice communication structure and its associated antennae, communication dishes and ground equipment within a 2.4 m high palisade fence compound at ESB's existing Flagford 220kV substation at
Erect a 110kV line bay in existing Flagford 220kV station to include the following current transformer, voltage transformer, circuit breaker, disconnects & ass. steelwork (excl. existing steel portals) at
permission is sought for a battery energy storage facility which will comprise of rechargeable battery units contained within up to 31 No. 40 foot containers on site and the associated development of unit substations, a 110KV substation, security fencing, security cameras, lightning mast, new site roads and new vehicular access. The facility will connect into the adjoining Flagford ESB Substation via underground cable. All associated site development, landscaping and boundary treatment works above and below ground on a c. 4.18 hectare site at
The application site is c.3.0 hectares. Permission is sought for a battery energy storage facility which will comprise of rechargeable battery units contained within up to 31 No. 40 foot containers on site and the associated development of unit substations, a 110 kV substation, security fencing, security cameras, lighting mast, new site roads and new vehicular access. The facility will connect into the adjoining Flagford ESB Substation via underground cable. All associated site development, landscaping and boundary treatment works above and below ground. Permission for development within the townland of
for the Flagford 220kV Station Reinforcement project involving: (1) Install a 220kV transformer bay comprising of busbar disconnects, circuit breaker, current transformers (CT), voltage transformers (VT) and surge arresters. (2) Install a 125MVA 220kV/110kV auto-transformer. (3) Install a 110kV transformer bay comprised of surge arresters, combined CT/VT'S, a circuit breaker and busbar disconnects. Works will be carried out within the boundary fence of Flagford 220kV Station located at
No Environment Impact Assesments Associated with this Application