Planning application details ref: 1864 Sligo CoCo

100%100% Complete (warning)

Planning Application: 1864 (Sligo CoCo)
File Number: 1864
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 07/03/2018 Decision Due Date: 28/08/2018
Validated Date: 07/03/2018 Invalidated Date:
Further Info Requested: 26/04/2018 Further Info Received: 04/07/2018
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 10/08/2018
Leave to Appeal: Appeal Date: 29/08/2018
Commenced Date: Submissions By:

Applicant Details

Applicant name: Derrysallagh Wind Farm Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works
Development Address: Carrowcashel, Tullynure, Glen, Straduff, and Ballynashee, Sligo, Co. Sligo
Architect Name: Elaine Bennett Location Key: CARROWCASHEL
Electoral Division: Planner: 03 Ward
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 10/08/2018 Manager Order: P365/18
Decision Type: Refused Number of Conditions: 1
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 04/03/2024
Decision Description: for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works

Appeal Details


Appeal Details
Notification Date: 29/08/2018 BP Reference #: ABP-302422-18
Appeal Type: APPLICANT File Forward Date: 06/09/2018
Submission Due Date: 25/09/2018 Submission Sent Date: 13/09/2018
Appeal Decision: CONDITIONAL Decision Date: 05/03/2019
Withdrawn Date: Dismissed Date:
Reason: