for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works
Development Address:
Carrowcashel, Tullynure, Glen, Straduff, and Ballynashee, Sligo, Co. Sligo
Architect Name:
Elaine Bennett
Location Key:
CARROWCASHEL
Electoral Division:
Planner:
03 Ward
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
10/08/2018
Manager Order:
P365/18
Decision Type:
Refused
Number of Conditions:
1
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
04/03/2024
Decision Description:
for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works
a ten year permission for construction of a wind farm consisting of 12 wind turbines with a total tip height not exceeding 130.5 metres, associated civil infrastructure, a sub-station including a control building and associated equipment, new internal access roads, and the upgrading of an existing road on site in the townlands of Glen, Knockroe, Derrysallagh and Rover, Co. Sligo. The planning application is accompanied by an Environmental Impact Statement (EIS)