development consisting of the extension of the lifespan of the operational Lackan Wind Farm by 12 years to October 2035. Lackan Wind Farm consists of 3 No. Turbines (64m hub height, 71m Rotor diameter - 99.5m tip height), site access roads, hardstand areas, underground cabling from each Turbine to the control building, drainage, and ancillary works, as granted Planning Permission in 2003 - Planning numbers PL02/816 and PL21.203388 refer. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR).
Development Address:
Lackan Townland, Kilglass, Iniscrone, Co Sligo
Architect Name:
Dan Keohane
Location Key:
Lackan
Electoral Division:
Planner:
06
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
26/01/2023
Manager Order:
P47/23
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
06/03/2023
Grant Managers Order #:
P47/23
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
19/06/2036
Decision Description:
development consisting of the extension of the lifespan of the operational Lackan Wind Farm by 12 years to October 2035. Lackan Wind Farm consists of 3 No. Turbines (64m hub height, 71m Rotor diameter - 99.5m tip height), site access roads, hardstand areas, underground cabling from each Turbine to the control building, drainage, and ancillary works, as granted Planning Permission in 2003 - Planning numbers PL02/816 and PL21.203388 refer. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR).
construction of 3 no. wind turbines, 60 metre hub height and 80 metre rotor diameter, access trackways, 4.5 metres in width, a substation building and associated site development works (planning ref. PL 02/816)