Planning application details ref: 2360288 Sligo CoCo

100%100% Complete (warning)

Planning Application: 2360288 (Sligo CoCo)
File Number: 2360288
Application Type: PERMISSION Planning Status: APPEALED
Received Date: 24/10/2023 Decision Due Date: 04/07/2024
Validated Date: 24/10/2023 Invalidated Date:
Further Info Requested: 15/12/2023 Further Info Received: 07/06/2024
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 04/07/2024
Leave to Appeal: Appeal Date: 29/07/2024
Commenced Date: Submissions By:

Applicant Details

Applicant name: Riverstown Locally Owned Turbine Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: Planning permission for a renewable wind energy development of a one (1) turbine wind farm. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind turbine, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will consist of permanent access tracks, hardstandings, an electrical substation building, an underground cable trench and ancillary site works. The maximum output capacity of the wind farm will be c.3.5mw.
Development Address: Riverstown, Gorteen, Co. Sligo
Architect Name: Location Key: Riverstown
Electoral Division: Planner: 11
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 04/07/2024 Manager Order: P364/24
Decision Type: Conditional Number of Conditions: 11
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: Planning permission for a renewable wind energy development of a one (1) turbine wind farm. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind turbine, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will consist of permanent access tracks, hardstandings, an electrical substation building, an underground cable trench and ancillary site works. The maximum output capacity of the wind farm will be c.3.5mw.

Appeal Details


Appeal Details
Notification Date: 31/07/2024 BP Reference #: ABP-320302-24
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 27/08/2024 Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: