Planning application details ref: 03510492 Tipperary County Council

100%100% Complete (warning)

Planning Application: 03510492 (Tipperary County Council )
File Number: 03510492
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 12/05/2003 Decision Due Date: 28/08/2003
Validated Date: 12/05/2003 Invalidated Date:
Further Info Requested: 03/07/2003 Further Info Received: 01/08/2003
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 27/08/2003
Leave to Appeal: Appeal Date: 20/09/2003
Commenced Date: Submissions By:

Applicant Details

Applicant name: Hibernian Windpower Ltd./ Coillte Teo
Applicant Address:
Phone Number: Fax Number:
Corresp. Address: c/o. Patrick Nolan, ESB International, 18/21 St. Stephen's Green, Dublin 2.

Applicant Details


Proposed Development

Development Description: Wind energy project comprising seventeen wind turbines each with a nominal rated capacity of approximately 2.5 MW, access tracks, a fenced electrical compound comprising a single storey control building and switchyard and a 50 metre high anemometer mast. Each wind turbine will comprise a tower up to 70 metres high with a diameter of about 4 metres at the base. Three blades of up to 40 metres in length will be attached.
Development Address: Bunkimalta/Bauraglanna, Lackabrack/Foilduff, Keeper Hill
Architect Name: Location Key: BUNKIMALTA, TOOR, NEWPORT
Electoral Division: 150 Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 27/08/2003 Manager Order:
Decision Type: Conditional Number of Conditions: 13
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 25/03/2009
Decision Description: Wind energy project comprising seventeen wind turbines each with a nominal rated capacity of approximately 2.5 MW, access tracks, a fenced electrical compound comprising a single storey control building and switchyard and a 50 metre high anemometer mast. Each wind turbine will comprise a tower up to 70 metres high with a diameter of about 4 metres at the base. Three blades of up to 40 metres in length will be attached.

Appeal Details


Appeal Details
Notification Date: 24/09/2003 BP Reference #: 22.204397
Appeal Type: THIRD PARTY File Forward Date: 01/10/2003
Submission Due Date: 21/10/2003 Submission Sent Date: 15/12/2003
Appeal Decision: MODIFIED Decision Date: 26/03/2004
Withdrawn Date: Dismissed Date:
Reason: