Alterations to existing 110kV Electrical Transformer Station. Consisting of a new 38kV linebay, comprising a cable sealing end, line disconnect, voltage transformer, current transformer, circuit breaker and busbar disconnection. Site development works consisting of erection of additional compound fencing.
Development Address:
Ballygammane, Thurles, Co. Tipperary
Architect Name:
Location Key:
BALLYGAMMANE, THURLES
Electoral Division:
150
Planner:
Hugh O'Brien
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
13/01/2004
Manager Order:
Decision Type:
Conditional
Number of Conditions:
6
Grant Date:
17/02/2004
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
16/02/2009
Decision Description:
Alterations to existing 110kV Electrical Transformer Station. Consisting of a new 38kV linebay, comprising a cable sealing end, line disconnect, voltage transformer, current transformer, circuit breaker and busbar disconnection. Site development works consisting of erection of additional compound fencing.
alterations to the existing 110kv electrical station, comprising of a new 38Kv line bay. The bay will comprise of busbar and line disconnects, voltage transformers, current transformers and circuit breaker, munted on a concrete plinth and one No. 12 meter high lattice steel tower within the confines of the 110kv station
of alterations to the existing 110kv electrical transformer station consisting of the installation of a capacitor bank bay containg current/voltage transformers arrsters and circuit breaker extension to the existing busbar to include steel portal frame 7 metres high and busbar disconnects ancillary works to include the removal of part of compound chainlink fence and the erection of new section of compound chainlink fence
development at the existing ESB Thurles 110kV Substation. The proposed development will consist of reinforcement and other development works at the existing Air Insulated Switchgear (AIS) substation, to ensure reliability of electricity provision. This reinforcement consists of the following elements: The up-rating of the existing 110kV busbar by replacing it with new tubular busbar; The provision of a new associated 110kV coupler bay; The single-storey extension of the existing 110kV station control building (approx. 45.5 sq.m.) to accommodate associated new equipment; The provision of 2 no. associated lightning masts (approx. 15m in height); Associated relocation of ASC Resistor Banks. All associated and ancillary site development works
extension to existing control building in Thurles 110 KV. Extension will accommodate an expansion to the battery room to allow for the installation of new battery back up system and all associated works
-alterations to the existing ESB Thurles 110kV station to include new 38kV line bay comprising of 3 No. 38kV busbar disconnects, 3 No. 38kV circuit breakers, 3 No. 38kV current/voltage transformers, 3 No. 38kV line disconnects, 3 No. cable sealing ends, 1 No. 12 metre high 38kV end mast and associated site works