Install a Biotech domestic effluent treatmnet unit and percolation area to the front of site to replace septic tank and percolation area to the rear of site as granted under PLC/22961.
to alter the Killonan - Shannonbridge 220kv transmission line adjacent to the existing N7 roadway. The alteration is required to facilitate the construciton of the new N7 High Quality Dual Carrigeway under and adjacent to the above mentioned transmission line. The proposed alteration will comprise of relocation of one lattice steel intermediate tower, of maximum height 35m, supoorting the line, which consists of three overhead steel reinforced aluminium conductors. Outline of the structures and line location will be show on drawings and maps which will be submitted with the planning application
reduce access from N7, reduce egress to side, remove existing steel container and construct block recycling storage building, provide timber fence and line of tree & shrub screening to the rear on the eastern boundary. Provide surface water collection system. Retention is sought for low level front boundary wall and low wall along eastern boundary, extended concrete area and fuel pumps located in the north-western area, revised position of oil intercepter and air/ water dispensing equipment. Revised illuminated I.D./price sign location and extended concrete aprons to the side and rear of Service Station premises
No Environment Impact Assesments Associated with this Application