development on a site of 8.7ha. and consist of removal of existing structures/debris (337.2m2) on site and provision of a single level Tesco Store (6,992.9m2 gross), and including an off-licence area, a cafe (129.8m2); ATM (2.6m2) and all ancillary areas including storage; unloading area; home shopping; cage marshalling; sprinkler tank and pump house; office/back of house and staff areas; service yard; and, delivery areas. Development will also provide for 3 no. retail warehouse units )2,354m2 gross); a surface level car park incorporating 32 no. mobility spaces and 28 no. parent and toddler spaces. The development will include all signage (173.7m2), totem (28.6m2), cycle stands, trolley bays, recycling facilities, waste management area; internal access road; lighting; boundary treatment; landscaping measures; vehicular and pedestrian access and egress arrangements; provision of new 4-arm roundabout and associated traffic calming and management measures along the N62, 2 no. ESB substations (68m2), ancillary infrastructure, and all associated site development works. An Environmental Impact Statement accompanies the planning application
to retain fuel & storage shed (original permission PLC/16267) and a waste oil collection tank; modifications to the fuel and storage shed to include additional floor area of 145 sqm, ancillary office 21.7 sqm and a toilet facility. Permission is sought for connection to the existing county council foul rising main to the front of the site and for a gas storage compound to west (rear) of the existing building
development on site of 7.78ha consisting of: removal of existing structures/debris on site. The proposal will provide for an urban development including an ancillary surface level car park. The overall development will include 2 no. retail warehouse units, a single level foodstore including an off-licence area, ATM and all ancillary areas including storage; unloading area; home shopping; cage marshalling; sprinkler tank and pump house; office/back of house and staff areas; service yard; and, delivery areas. The total gross area of the above is 9,067sqms. The development will also include all signage (210sqms), totem (26.6sqms), cycle stands, trolley bays, recycling facilities, waste management area; internal access road; lighting; boundary treatment; landscaping measures; vehicular and pedestrian access and egress arrangements; provision of new 4-arm roundabout and associated traffic calming and management measures along the N62, 2 no. ESB substations (50sqms), ancillary infrastructure and all associated site development works. An Environmental Impact Statement accompanies the planning application
10 year planning permission for phase 1(4577sqm GFA) of a Masterplan development including: light industrial/commercial park(4538sqm) across 3 no. blocks, & will include:(a) 1 no. 2-storey office block(951sqm);(b) 1 no. warehouse(2425sqm) incorporating office space(2-storey) & service yard; (c) 1no. industrial block(1162sqm) consisting of 2 no. workshops & office sapce (2-storey);(d) provision for a pumping station incorporating pumping chambers & kiosk with control room(39sqm);(e) engineering works, including rising mains(connecting to public sewer), surface water drain & watermain along N62;(f) removal of existing access & a 3-arm roundabout along N62 as well as new pedestrian access; (g)landscaping, footpaths, boundary treatments, signage, car parking (122), ESB Substation, attenuation tanks & associated site development works