Planning Application: 09805 (Tipperary County Council )
File Number:
09805
Application Type:
PERMISSION FOR RETENTION
Planning Status:
APPLICATION FINALISED
Received Date:
15/12/2009
Decision Due Date:
08/09/2010
Validated Date:
15/12/2009
Invalidated Date:
Further Info Requested:
16/02/2010
Further Info Received:
12/08/2010
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
08/09/2010
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Michael Bergin
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
retain 6 mushroom tunnels and canopy over constructed mushroom tunnels, as-constructed dry store area nos. 30, 31, 32 and 35, as-constructed dry store no. 33 and placing within dry store no. 33 a fully enclosed combined heat and power biomass system, as-constructed enclosed woodchip biofilter for steam from biomass system with 4 metre flue mounted on roof, as-constructed soil water tank and associated works
retain 6 mushroom tunnels and canopy over constructed mushroom tunnels, as-constructed dry store area nos. 30, 31, 32 and 35, as-constructed dry store no. 33 and placing within dry store no. 33 a fully enclosed combined heat and power biomass system, as-constructed enclosed woodchip biofilter for steam from biomass system with 4 metre flue mounted on roof, as-constructed soil water tank and associated works
development of 12 mushroom tunnels with building canopy, also to replace mushroom tunnel no. 8 with dry store building and move mushroom tunnel no. 8 to new area on the site to no. 63, to include building canopy at one end of tunnel, proposed dry store building no. 64 to include cold store and packaging area. Proposed dry store building no. 61 will incorporate woodchip boiler house. Propose to decommission existing septic tank and percolation area with proposed waste water treatment system and percolation area to a new area on the site, proposed 2 soil water tanks, proposed 40 car parking spaces, also Planning Permission to construct photovoltaic solar panels onto dry store buildings for own on farm use and all associated works on our land
development of 12 mushroom tunnels with building canopy no. 83, proposed dry store building no. 70 to include cold store and packaging area will also incorporate woodchip boiler as renewable heat source. Planning Permission to construct photovoltaic solar panels onto dry store building no. 70 and building no. 83 for own on farm use. Also proposed 16 car parking spaces with heavy duty fence panel and beech hedge perimeter and all associated works on our land
development of 12 mushroom tunnels with building canopy, also to replace mushroom tunnel no. 8 with dry store building and move mushroom tunnel no. 8 to new area on the site to no. 63, to include building canopy at one end of tunnel, proposed dry store building no. 64 to include cold store and packaging area. Proposed dry store building no. 61 will incorporate woodchip boiler house. Propose to decommission existing septic tank and percolation area with proposed waste water treatment system and percolation area to a new area on the site, proposed 2 soil water tanks, proposed 40 car parking spaces, also Planning Permission to construct photovoltaic solar panels onto dry store buildings for own on farm use and all associated works on our land
Walsh Mushrooms Golden Ltd Cloghleigh, Golden Co. Tipperary
a two-storey extension (south) building no. 70 reference in register 19601272 and for permission for a first floor extension within the southwest section of building no. 70 for staff welfare facilities and operational offices/meeting rooms, addition of lean-to loading bay (west façade), associated alterations to elevations/facades and all associated works