for an extension to Monaincha Wind Farm (Planning Ref 11/51/0203). The extension will comprise of 5 No. turbines with a tip height of up to 156m and associated access tracks and site works. An Environmental Impact Statement and Natura Impact Statement accompany this application.
Development Address:
Monaincha & The Sheehys, Roscrea, Co Tipperary
Architect Name:
Location Key:
MONAINCHA, ROSCREA
Electoral Division:
150
Planner:
Feargus Wright
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
05/07/2012
Manager Order:
Decision Type:
Conditional
Number of Conditions:
15
Grant Date:
09/08/2012
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
08/08/2017
Decision Description:
for an extension to Monaincha Wind Farm (Planning Ref 11/51/0203). The extension will comprise of 5 No. turbines with a tip height of up to 156m and associated access tracks and site works. An Environmental Impact Statement and Natura Impact Statement accompany this application.
overhead 38kV line from Ikerrin 110kV station in the townland of Derrymore to the proposed Monaincha Windfarm 38kV station in the townland of Monaincha. The proposed line will be erected over, or in the vicinity of
the erection of a 58.11 hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 30 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic PV panels, mounted on steel support structures 3m in height, together with 1 single storey ESB control room, 25 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, wooden fence along part of the M7 Motorway, wooden fence placed along the western site boundary, site entrance and access roads, including landscaping along the western and south eastern site boundaries, and other associated development works, for the purpose of generating renewable energy electricity. The proposed solar farm will have a capacity of 25MW.
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council (16/600917) and An Bord Pleanála (Pl92.249060), which comprises consent for a Solar PV Energy Development and for planning permission for a proposed Battery Energy storage system - amendments include; (1) changes to the configuration of the Solar PV rows, (2) a reduction in the height of the solar PV panels, (3) reduction in the spacing of Solar PV rows (strings), (4) increase in size of solar panels, (5) increase in solar panel output resulting in an overall increase in solar power generation, (6) a change in solar panels tilt (degree), (7) an increase in the number of transformers/inverters, (8) an increase in the area of the individual transformers, (9) an increase in the number of panels, (10) the introduction of a Battery Energy Storage system with a compound size of 5,400 square metres containing 60 battery units and 30 inverter units, all of which measure 6.1 m in length, 2.45m in width and 2.9m in height, together with a switch room/SCADA room - A Natura Impact Statement will also be submitted with the application