the construction of a part two storey, part single storey 50 bed residential community nursing care unit (c. 4510m² total gross floor area) including; a courtyard garden; a production kitchen and laundry; ancillary support accommodation; an enclosed gated service yard incorporating a generator, electrical substation; waste marshalling stores and office area with a screened mechanical and electrical plant area at first floor. The development will also consist of the upgrade to an existing vehicular entrance and access road off Ormond Drive into the site, installation of new services, the provision of a sustainable urban drainage system and new access roads and footpaths with associated hard and soft landscaping and parking for 70 cars and the reinstatement of an existing pedestrian entrance to the south west of the site to provide access to the site from the Tyone Road through the Hospital grounds and the provision of a controlled emergency access way and pedestrian entrance from the hospital into the site involving the formation of two new openings in the existing rubble masonry boundary wall to the south of the site. The development also includes the reinstatement of an existing pedestrian access way to the south west of the site linking to the site from the Tyone Road through the hospital grounds and the provision of a controlled emergency access way from the hospital into the site involving the formation of two openings in the existing rubble masonry boundary wall to the south of the site, adjacent to Nenagh General Hospital. The boundary wall is within the curtilage of a protected structure Ref No 121.
the construction of a part two storey, part single storey 50 bed residential community nursing care unit (c. 4510m² total gross floor area) including; a courtyard garden; a production kitchen and laundry; ancillary support accommodation; an enclosed gated service yard incorporating a generator, electrical substation; waste marshalling stores and office area with a screened mechanical and electrical plant area at first floor. The development will also consist of the upgrade to an existing vehicular entrance and access road off Ormond Drive into the site, installation of new services, the provision of a sustainable urban drainage system and new access roads and footpaths with associated hard and soft landscaping and parking for 70 cars and the reinstatement of an existing pedestrian entrance to the south west of the site to provide access to the site from the Tyone Road through the Hospital grounds and the provision of a controlled emergency access way and pedestrian entrance from the hospital into the site involving the formation of two new openings in the existing rubble masonry boundary wall to the south of the site. The boundary wall is within the curtilage of a protected structure Ref No 121.
No Environment Impact Assesments Associated with this Application