14600393 |
INCOMPLETED APPLICATION |
PERMISSION |
|
28/10/2014 Tuesday |
Applegreen Services Areas Ltd |
Lackanavea Birdhill Co Tipperary |
modifications to Planning Permission NTCC Ref 12/510421/ABP Ref 22.242361 and 14/600098 for a motorway service area. The modifications will comprise: A vehicular access to/from the northbound roundabout of the M7 Junction 27 to the motorway service area. Associated modifications to the access arrangement for the permitted access to/from R494. All ancillary site development, landscaping and boundary treatment works to facilitate future segregation of HGV parking for secure overnight parking |
2288 |
WITHDRAWN |
PERMISSION |
C |
04/02/2022 Friday |
Applegreen Service Areas Ltd. |
Birdhill Service Area Junction 7 (M7) Lackanavea, Birdhill, Co. Tipperary |
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting |