Planning Application: 15600566 (Tipperary County Council )
File Number:
15600566
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
10/07/2015
Decision Due Date:
03/09/2015
Validated Date:
10/07/2015
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
01/09/2015
Leave to Appeal:
Appeal Date:
24/09/2015
Commenced Date:
Submissions By:
13/08/2015
Applicant Details
Applicant name:
ABO Wind Ireland Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for amendments & additions to an electrical substation associated with a previously permitted, 5 turbine wind farm development Ref No 12/51/0385. The electrical substation is situated in the townland of Graniera, Co Tipperary. Proposed amendments & additions include: a change from the permitted 20Kv to 38Kv electrical substation, changes to the electrical sub station control building including and increase in the area from approx 66m2 to approx 70m2, (building will measure approx 11.4m by 6.1m) Increase in max height from approx 4.6m to 5.95m & internal re-organisation of the layout the inclusion of adjoining switch gear compound ( approx 688m2 in area) enclosed by a pallisade security fence & vehicular access gates & construction of a crane hardstanding adjacent to compound, measuring approx 12m X 12m in area. The proposed development also includes for landscaping and all associated ancillary site development works above & below ground. An Environmental Impact Statement has been submitted.
Development Address:
Knockcurraghbola Commons, Graniera, Shevry , Co Tipperary
Architect Name:
Location Key:
KNOCKCURRAGHBOOLA, MILESTONE,THURLE
Electoral Division:
Planner:
Marie Ryan
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
01/09/2015
Manager Order:
Decision Type:
Conditional
Number of Conditions:
1
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
31/08/2021
Decision Description:
for amendments & additions to an electrical substation associated with a previously permitted, 5 turbine wind farm development Ref No 12/51/0385. The electrical substation is situated in the townland of Graniera, Co Tipperary. Proposed amendments & additions include: a change from the permitted 20Kv to 38Kv electrical substation, changes to the electrical sub station control building including and increase in the area from approx 66m2 to approx 70m2, (building will measure approx 11.4m by 6.1m) Increase in max height from approx 4.6m to 5.95m & internal re-organisation of the layout the inclusion of adjoining switch gear compound ( approx 688m2 in area) enclosed by a pallisade security fence & vehicular access gates & construction of a crane hardstanding adjacent to compound, measuring approx 12m X 12m in area. The proposed development also includes for landscaping and all associated ancillary site development works above & below ground. An Environmental Impact Statement has been submitted.
Knockcurraghbola Commons Knockcurraghbola Crownlands Graniera and Shevry
wind energy project comprising of five wind turbines each with a maximum tip height of 126 metres. construction of new access tracks and the upgrading of existing tracks, an electrical substation, a borrow pit and associated works. The application is for a 10 year permission; an E.I.S. accompanies the application
ten year planning permission to develop an electricity service, entailing of the laying of a 20kV underground cable from the proposed Inchivara Wind Farm to proposed 38V substation at Graniera and a 38kV underground cable from the proposed 38kV substation at Graniera to the existing Cauteen 110kV/38kV substation at Seskin, Co Tipperary. The proposed development will consist of three phase underground electrical cables laid in ducts, with communications cable, draw pits, jointing bays, cable sheath sectionalising chambers, works to terminus substations and all associated works