Planning Application: 16600432 (Tipperary County Council )
File Number:
16600432
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
11/05/2016
Decision Due Date:
21/02/2017
Validated Date:
11/05/2016
Invalidated Date:
Further Info Requested:
04/07/2016
Further Info Received:
25/01/2017
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
20/02/2017
Leave to Appeal:
Appeal Date:
20/03/2017
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
ESB Wind Development Ltd. & Coillte Teoranta
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
modifications to the existing entrance from the L-2163 to the Keeper Hill Coillte Forest. This modified entrance will provide access to the permitted Bunkimalta Wind Energy Project. Modifications to the existing forest entrance were previously permitted as part of the Bunkimalta Wind Energy Project planning permission (TCC Reg. Ref. 13/51/0035 and ABP PL 22.241924)
Development Address:
Knockfune, Co. Tipperary
Architect Name:
Location Key:
KNOCKFUNE, CO. TIPPERARY
Electoral Division:
Planner:
Maire Daly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Time Extension on FI - 3 months.
Decision
Decision Date:
20/02/2017
Manager Order:
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
25/09/2017
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
24/09/2027
Decision Description:
modifications to the existing entrance from the L-2163 to the Keeper Hill Coillte Forest. This modified entrance will provide access to the permitted Bunkimalta Wind Energy Project. Modifications to the existing forest entrance were previously permitted as part of the Bunkimalta Wind Energy Project planning permission (TCC Reg. Ref. 13/51/0035 and ABP PL 22.241924)
Bunkimalta, Bauraglanna, Lackabrack, Knockfune and Foilduff at Keeper Hill
10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application
installation of approximately 22.25km of 38kV underground cable (UGC) between Bunkimalta Wind Farm and Nenagh 110kV substation, to be installed primarily in public roads. The application is accompanied by a Natura Impact Statement (NIS)
No Environment Impact Assesments Associated with this Application