Planning application details ref: 18600187 Tipperary County Council

100%100% Complete (warning)

Planning Application: 18600187 (Tipperary County Council )
File Number: 18600187
Application Type: PERMISSION Planning Status: WITHDRAWN
Received Date: 16/02/2018 Decision Due Date:
Validated Date: 16/02/2018 Invalidated Date:
Further Info Requested: 10/04/2018 Further Info Received: 25/05/2018
Withdrawn Date: 06/02/2020 Extend Date:
Decision Type: Conditional Decision Date: 20/06/2018
Leave to Appeal: Appeal Date: 12/07/2018
Commenced Date: Submissions By:

Applicant Details

Applicant name: Greener Ideas Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: development consisting of the construction of a 100MW battery energy storage system (BESS) with associated balance of plant, equipment and buildings including:a BESS building of 8m height, 82m length and 44m width (comprising of the ground floor a battery rack room, meeting room, contractor/storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, inverter rooms, and on a mezzanine floor a HVAC/store room); 2 no. 905m3 firewater storage tanks, an 853m3 underground surface water attenuation tank, an 1030m3 underground firewater retention tank, a 110kV electrical substation and control building of approximately 5.2m height and an access and circulation road with new junction onto the local road, footpath, 8 no. car parking spaces, 3 no. retaining wall structures up to a height of 3m and native tree and scrub planting, 3m paladin security fence, and all other associated site development works including surface water and foul drainage required to facilitate the development
Development Address: Kilcommonmore (North), Cahir, Co. Tipperary
Architect Name: Location Key: KILCOMMONMORE NORTH
Electoral Division: Planner: JF
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 20/06/2018 Manager Order:
Decision Type: Conditional Number of Conditions: 13
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: development consisting of the construction of a 100MW battery energy storage system (BESS) with associated balance of plant, equipment and buildings including:a BESS building of 8m height, 82m length and 44m width (comprising of the ground floor a battery rack room, meeting room, contractor/storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, inverter rooms, and on a mezzanine floor a HVAC/store room); 2 no. 905m3 firewater storage tanks, an 853m3 underground surface water attenuation tank, an 1030m3 underground firewater retention tank, a 110kV electrical substation and control building of approximately 5.2m height and an access and circulation road with new junction onto the local road, footpath, 8 no. car parking spaces, 3 no. retaining wall structures up to a height of 3m and native tree and scrub planting, 3m paladin security fence, and all other associated site development works including surface water and foul drainage required to facilitate the development

Appeal Details


Appeal Details
Notification Date: 17/07/2018 BP Reference #: ABP-302055-18
Appeal Type: THIRD PARTY File Forward Date: 20/07/2018
Submission Due Date: 13/08/2018 Submission Sent Date: 13/08/2018
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: