Planning Application: 18601043 (Tipperary County Council )
File Number:
18601043
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
24/08/2018
Decision Due Date:
18/10/2018
Validated Date:
24/08/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
15/10/2018
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
27/09/2018
Applicant Details
Applicant name:
Ionity GMBH
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
Development Address:
Circle K Motorway Service Area, Junction 8 M8 Motorway, Wallers Lot Cashel, Co Tipperary
Architect Name:
Location Key:
WALLER'S LOT
Electoral Division:
Planner:
Carmel Daly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
15/10/2018
Manager Order:
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
19/11/2018
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
18/11/2023
Decision Description:
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
development which will consist of the redevelopment and extension of the existing Topaz Motorway Services Area at Junction 8 on the M8 Motorway to provide the following: 1) A single storey 90.3 sqm extension to the existing service station building to incorporate 24hr public toilet and shower facilities and a new storeroom. 2) A single storey 66.5 sqm extension to the existing McDonalds restaurant building to incorporate new seating areas. 3) The realignment and raising of an existing access road. 4) The relocation of the existing car wash facility. 5) The relocation of the existing HGV fuel pump islands. 6) A new children's play area and refuse areas. 7) The rearrangement of existing car parking and the provision of new parking areas to incorporate 86 no. car parking spaces, 6 no. bicycle stands, 8 no. motorbike parking spaces, 8 no. coach parking spaces and 20 no. HGV parking spaces. The development also includes all associated boundary treatments, drainage works, new access arrangements, hard and soft landscaping, infrastructural and site development works
the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway
Circle K Motorway Services Area Junction 8, M8 Motorway Waller's Lot, Cashel
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
No Environment Impact Assesments Associated with this Application