Planning Application: 19601323 (Tipperary County Council )
File Number:
19601323
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
28/11/2019
Decision Due Date:
31/01/2020
Validated Date:
28/11/2019
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
31/01/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
10/01/2020
Applicant Details
Applicant name:
Soleire Renewables Spv Alpha 2 Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the erection of a 29.09 Hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic PV Panels, mounted on steel support structures 2.885m in height, together with a single storey ESB Control Room, connection to nearby ESB Substation, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing around the site boundary, Site Entrance access roads, Temporary Construction Compound Area, Landscaping and other associated development works, for the purpose of generating renewable energy electricity
Development Address:
Derrymore, Roscrea, Co Tipperary
Architect Name:
Location Key:
DERRYMORE, ROSCREA
Electoral Division:
Planner:
ANNE MARIE DEVANEY
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
31/01/2020
Manager Order:
Decision Type:
Conditional
Number of Conditions:
17
Grant Date:
06/03/2020
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
05/03/2030
Decision Description:
the erection of a 29.09 Hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic PV Panels, mounted on steel support structures 2.885m in height, together with a single storey ESB Control Room, connection to nearby ESB Substation, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing around the site boundary, Site Entrance access roads, Temporary Construction Compound Area, Landscaping and other associated development works, for the purpose of generating renewable energy electricity
overhead 38kV line from Ikerrin 110kV station in the townland of Derrymore to the proposed Monaincha Windfarm 38kV station in the townland of Monaincha. The proposed line will be erected over, or in the vicinity of
amending the design of the previously approved development (Planning Reference: 19601323, Tipperary County Council) which comprises consent for a 10 year period to construct and a 40 year period to operate a 29.09 hectare Solar PV Energy Development at Derrymore Townland, Roscrea, Co Tipperary. The proposed amendments include; (1) changes to the configuration of the Solar PV rows, (2) reduction in the height of the Solar PV panels, (3) slight increase in the bottom height of the Solar PV panels, (4) reduction in the spacing of Solar PV rows (strings), (5) increase in size of solar panels, (6) increase in solar panel output, (7) a change in solar panels tilt (degree) and (8) a decrease in the number of solar panels. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development