File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
02510022 |
WITHDRAWN |
PERMISSION |
|
22/04/2002 Monday |
Paul McCormack |
Garrynatineel Ballina
|
Industrial unit and associated site development works including a proprietary treatment plant and bored well. |
02510795 |
WITHDRAWN |
PERMISSION |
|
13/12/2002 Friday |
Danny Ryan |
Garrynatineel Ballina |
Change of use of part of an industrial unit (as granted under planning approval ref. no. PLC/22094) to a retail furniture store. |
05510146 |
WITHDRAWN |
PERMISSION |
|
14/02/2005 Monday |
Danny Ryan |
Garrynatineel Ballina Co Tipperary |
Industrial unit (attached to existing industrial/commercial unit), use of existing entrance, connect to existing treatment plant on site and all ancillary site works |
06511048 |
APPLICATION FINALISED |
PERMISSION |
C |
28/07/2006 Friday |
David Fitzgerald & Danny Ryan & Matt Byrnes |
Fort Henry Business Park Garrynatineel Ballina |
alterations and extension to two exising warehouse/industrial units and the construction of new warehousing/industrial units to form an industrial estate of 4 separate buildings, with revised road access and sightlines, new internal road network, sewage treatment plant and ancillary site development |
09510187 |
APPLICATION FINALISED |
PERMISSION |
C |
03/04/2009 Friday |
Danny Ryan |
Fort Henry Business Park Garrynatineel Ballina |
alterations and extension to warehouse/industrial unit number 3 and associated revisions to the site layout plan approved under planning reference 06511048 |
11510444 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
21/12/2011 Wednesday |
Danny Ryan |
Fort Henry Business Park Garrynatineel Ballina |
alterations and extension to two existing warehouse/industrial units and the construction of new warehousing/industrial units to form an industrial estate of 4 separate buildings, with revised road access and sightlines, new internal road network, sewage treatment plant and ancillary site development - 06511048 |
11510445 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
21/12/2011 Wednesday |
Danny Ryan |
Fort Henry Business Park Garrynatineel Ballina |
alterations and extension to warehouse/industrial unit number 3 and associated revisions to the site layout plan approved under planning reference 06511048; 09510187 |
13510354 |
APPLICATION FINALISED |
PERMISSION |
C |
25/10/2013 Friday |
Malcolm Bell |
Fort Henry Business Park Garrynatineel Ballina |
(a) proposed reconfiguration of units 3A-3G2 resulting in an internal floor increase of 300m2, including minor elevation and office height changes relevant ref. 09510187, (b) permission for retention of 1033m2 first floor office accommodation to units 3H-3L relevant reference 09510187, (c) proposed new 2180 m2 ground floor and first floor extension to units 3H-3L, (d) proposed new 1360 m2 local ground floor and new first floor office accommodation to unit 1 relevant reference 06511048 (e) and new pedestrian covered walkway, new local internal road network and local new building signage. |
19601454 |
INCOMPLETED APPLICATION |
PERMISSION FOR RETENTION |
|
20/12/2019 Friday |
Techno-Path Manufacturing Ltd. |
Fort Henry Business Park Garrynatineel Ballina, Co. Tipperary |
3 temporary refrigeration units, air handling units, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L, and alterations and omissions to previously approved Planning reference 13510354. The alterations include internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works. The omissions include omitting the approved extensions to units 3A - 3G2 and to the east of units 3J, I and H, including part of the extension to the west of units 3J, I and H and the covered walkway |
2014 |
INCOMPLETED APPLICATION |
PERMISSION FOR RETENTION |
|
10/01/2020 Friday |
Techno-Path Manufacturing Ltd. |
Fort Henry Business Park Garrynatineel, Ballina |
3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works. |
5119576 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
C |
09/04/1998 Thursday |
Pat Mulcahy |
Garrynatineel, Ballina
|
3 industrial units |
5122094 |
APPLICATION FINALISED |
APPROVAL |
C |
07/03/2000 Tuesday |
Danny Ryan |
Garrynatineel, Ballina
|
Industrial unit with new entrance, bio-disc drainage unit and associated site works |