Planning Application: 20251 (Tipperary County Council )
File Number:
20251
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
13/03/2020
Decision Due Date:
02/07/2020
Validated Date:
13/03/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
17/06/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
11/06/2020
Applicant Details
Applicant name:
Lough Derg Yacht Club
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
improvements to the boat mooring facilities at the western shoreline of the north jetty at the applicant's landholding to include a) removal of existing timber edge decking, localised re-alignment of the shoreline on the south-western section of the north jetty with new c. 2 m wide walkway/pier edge constructed on a line of a new stone filled galvanised steel mesh gabions topped with sustainable hardwood jetty edging and bitmac path onshore, b) proprietary "Versa-Dock" part floating docking system for mooring an RNLI rescue rigid inflatable boat (RIB) to facilitate rapid launching in emergencies and safe mooring of the RIB, c) low bollard type (c. 1.4 m high) safety lighting, d) underground services - electrical supplies, cables, hubs, water supplies from the existing LDYC water services system, e) domestic effluent pump-out station for sailing and motor boats (mainly cruisers) with receiving/pumping station to connect to existing foul effluent sewerage system at the Club, associated drainage and site works, f) landscaping enhancements - selection of indigenous tree species to provide wind protection to the moorings and to provide screening from the lake
The dates and timelines on this application may be affected by the Emergency Covid-19 legislation.
Decision
Decision Date:
17/06/2020
Manager Order:
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
21/07/2020
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
20/07/2025
Decision Description:
improvements to the boat mooring facilities at the western shoreline of the north jetty at the applicant's landholding to include a) removal of existing timber edge decking, localised re-alignment of the shoreline on the south-western section of the north jetty with new c. 2 m wide walkway/pier edge constructed on a line of a new stone filled galvanised steel mesh gabions topped with sustainable hardwood jetty edging and bitmac path onshore, b) proprietary "Versa-Dock" part floating docking system for mooring an RNLI rescue rigid inflatable boat (RIB) to facilitate rapid launching in emergencies and safe mooring of the RIB, c) low bollard type (c. 1.4 m high) safety lighting, d) underground services - electrical supplies, cables, hubs, water supplies from the existing LDYC water services system, e) domestic effluent pump-out station for sailing and motor boats (mainly cruisers) with receiving/pumping station to connect to existing foul effluent sewerage system at the Club, associated drainage and site works, f) landscaping enhancements - selection of indigenous tree species to provide wind protection to the moorings and to provide screening from the lake
Temporary Inshore lifeboat station based at the premises of Lough Derg Yacht Club, Dromineer. To facilitate same, permission is sought to erect temporary storage structures and a demountable portacabin for a period of three years and six months and use the club facilities generally for rescue, training and related purposes
improvements to the boat mooring facilities at the north eastern shoreline of the applicant's landholding. The proposed improvements consist of the following integrated developments: (a) localised re-alignment of the shoreline on the north eastern section for approximately 103 meters with proposed new c.2M wide walkway/pier edge constructed of timber decking on joisting on steel beams on mini-piles at with RC kerb onshore; (b) localised reduction in lakebed levels (typically 800mm) to achieve 1.5 meter draft at mean summer lake water level for the immediate lakeside approaches and proposed tie up mooring area; (c) low bollard type (c. 1.4M high) safety lighting, (d) underground services:- electrical supplies, cables, hubs, water supplies from the existing LDYC water services system; (e) associated siteworks; (f) landscaping - selection of indigenous tree species to screen the mooring area from view - mainly from the lake
improvements to the boat mooring facilities at the north eastern shoreline of the applicant's landholding. The proposed improvements consist of the following integrated developments: (a) localised re-alignment of the shoreline on the north eastern section for approximately 103 meters with proposed new c.2M wide walkway/pier edge constructed of timber decking on joisting on steel beams on mini-piles with RC kerb onshore; (b) localised reduction in lakebed levels (typically 800mm) to achieve 1.5 meter draft at mean summer lake water level for the immediate lakeside approaches and proposed tie up mooring area; (c) low bollard type (c. 1.4M high) safety lighting, (d) underground services:- electrical supplies, cables, hubs, water supplies from the existing LDYC water services system; (e) associated siteworks; (f) landscaping - selection of indigenous tree species to screen the mooring area from view - mainly from the lake
inshore lifeboat station comprising portcabin and 2 storage containers for a period of 5 years, These facilities were previously permitted on a temporary basis under planning permission reference 04510250
provision of demountable jib crane with capacity 2 ton SWL (Safe Working Load) which will be located adjacent to the slipway in existing private members harbour - use will be to 1. increase safety during lift in and out of members boats, 2. provide for servicing of masts and rigging, 3. facilitate launching and retrieval of visiting boats during racing events
No Environment Impact Assesments Associated with this Application