Planning application details ref: 211502 Tipperary County Council

100%100% Complete (warning)

Planning Application: 211502 (Tipperary County Council )
File Number: 211502
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 12/10/2021 Decision Due Date: 31/10/2022
Validated Date: 12/10/2021 Invalidated Date:
Further Info Requested: 03/12/2021 Further Info Received: 06/09/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 27/10/2022
Leave to Appeal: Appeal Date: 23/11/2022
Commenced Date: Submissions By:

Applicant Details

Applicant name: ABO Wind Ireland Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a ten-year permission of a wind farm project. The development will consist of: Construction of up to 7 no. wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; Circa 19km of 38kV underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kV wind farm electrical substation to the existing 38/110kV Doon substation in the townland of Ballyvaughan; Provision of a new site entrance on the L2035; Upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; A temporary site compound and all associated works; Demolition of 2 no. derelict buildings; Provision of 2 no. cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross Protected Structure RPS S121 (Loughcapple Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application
Development Address: Knockroe, Kilnagranagh, Newtowndrangan, Tullowcussaun, Ballyvadlea, Ballyhomuck, Kilburry West, Milestown, Bannixtown, Quartercross, Clare More, Killusty North, Killusty South, Kiltinan, Loughcapple, Grange Beg, Miltown Britton, Mullenranky, Kilmore,, Ballinvoher, Redmondstown and Ballyvaughan, Co. Tipperary
Architect Name: Location Key: KNOCKROE
Electoral Division: Planner: Paul Killeen
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: Yes Protected Structure #: RPS S121
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: FI time ext - 3 months

Decision

Decision Date: 27/10/2022 Manager Order:
Decision Type: Conditional Number of Conditions: 23
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 30/11/2028
Decision Description: a ten-year permission of a wind farm project. The development will consist of: Construction of up to 7 no. wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; Circa 19km of 38kV underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kV wind farm electrical substation to the existing 38/110kV Doon substation in the townland of Ballyvaughan; Provision of a new site entrance on the L2035; Upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; A temporary site compound and all associated works; Demolition of 2 no. derelict buildings; Provision of 2 no. cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross Protected Structure RPS S121 (Loughcapple Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application

Appeal Details


Appeal Details
Notification Date: 29/11/2022 BP Reference #: ABP-315176-22
Appeal Type: THIRD PARTY File Forward Date: 07/12/2022
Submission Due Date: 04/01/2023 Submission Sent Date: 21/12/2022
Appeal Decision: CONDITIONAL Decision Date: 01/12/2023
Withdrawn Date: Dismissed Date:
Reason: