File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
031639 |
WITHDRAWN |
PERMISSION |
|
22/12/2003 Monday |
Hollycourt Developments Ltd |
Woodlands Barnora Cashel Road |
childcare/creche facility and a retail unit with 4 no. 2-bed apartments over |
041424 |
APPLICATION FINALISED |
PERMISSION |
R |
10/11/2004 Wednesday |
Hollycourt Developments Ltd |
Woodlands Barnora Cashel Road |
a neighbourhood centre and residential development which will be partly 3 storey will include the following: 3 no. shop units and stores creche (single storey), 2 no. 1-bedroom dormer type apartments (over shops), 3 no. 3-bedroom two-storey apartments (over shops), 1 no. 1-bedroom apartment (over shop), 3 no. 2-bedroom apartments (over archway & shop), 4 no. 4-bedroom two-storey town houses, 8 no. 3-bedroom two-storey town houses and will include site development works and external works |
061175 |
WITHDRAWN |
PERMISSION |
|
14/07/2006 Friday |
Barry Harte |
Barnora Cahir Co. Tipperary |
development of a supermarket of 3,293sq m Gross Floor Area (New Floor Area 2,026 sq m) to allow for food and alcohol sales area with 238 car parking spaces, signage, external service yard and car park lighting, associated site development works, ancillary landscaping and boundary treatments, ESB substation, provision of a recycling area and cycle parking, and provision of a new vehicular access including mini roundabout on the Inner Relief Road |
08246 |
APPLICATION FINALISED |
PERMISSION |
C |
29/02/2008 Friday |
Rosemount Developments |
Barnora Cahir Co Tipperary |
part two storey/part single storey Neighbourhood Centre of gross floor area 3144 sq m, retail unit 187 sq m, Medical Centre 357 sq m, Convenience store 508 sq m, 5 no. retail units 974 sq m, first floor offices suite 760 sq m, First floor Restaurant 358 sq m, site development works to facilitate the development including provision of car parking, 3 bin store areas, landscaping, infrastructural works includung connection to existing services and construction of a new spur and road works necessary to accomodate an access road to service the site and adjoining lands from existing roundabout located at entrance to Colaiste Dun Iascaigh, |
14106 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
C |
07/04/2014 Monday |
Rosemount Developments |
Barnora Cahir Co Tipperary |
part two storey/part single storey Neighbourhood Centre of gross floor area 3144 sq m, retail unit 187 sq m, Medical Centre 357 sq m, Convenience store 508 sq m, 5 no. retail units 974 sq m, first floor offices suite 760 sq m, First floor Restaurant 358 sq m, site development works to facilitate the development including provision of car parking, 3 bin store areas, landscaping, infrastructural works including connection to existing services and construction of a new spur and road works necessary to accommodate an access road to service the site and adjoining lands from existing roundabout located at entrance to Colaiste Dun Iascaigh, |
18600331 |
APPLICATION FINALISED |
PERMISSION |
C |
20/03/2018 Tuesday |
Nivon Healthcare T/A Zest Healthcare |
Rosemount Close Barnora, Cashel Road Cahir |
the development will consist of the provision of a Primary Care Centre over two floors, measuring 1,885 m2 gross floor area, consisting of A. a general medical practice clinic; consultation rooms, offices and treatment areas, B. a public healthcare facility, procedure rooms, treatment rooms, office & administration suites, C. a single storey pharmacy annexe, D. a 72 surface car parking spaces at grade, E. the provision of a new entrance to the site from the existing public roadway on Rosemount Close, F. an outlying electrical supply substation and waste disposal storage compound single storey building, and all associated site works at the foregoing site address |
2095 |
DECLARED WITHDRAWN |
PERMISSION |
|
05/02/2020 Wednesday |
Andrew Fanning |
Barnora Cahir Co. Tipperary |
infrastructural works including (i) an access road and entrance to service lands and adjoining lands from the existing roundabout located at the entrance to Colaiste Dun Iascaigh (ii) connection to existing services and all associated site works |