Planning application details ref: 2360925 Tipperary County Council

100%100% Complete (warning)

Planning Application: 2360925 (Tipperary County Council )
File Number: 2360925
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 22/11/2023 Decision Due Date: 10/09/2024
Validated Date: 22/11/2023 Invalidated Date:
Further Info Requested: 25/01/2024 Further Info Received: 17/07/2024
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 09/09/2024
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 20/08/2024

Applicant Details

Applicant name: Arrabawn Co-Operative Society Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: the installation of an underground pumped outfall pipeline for the conveyance of cooling water, condensate and treated effluent from their existing waste water treatment plant site at Knockanpierce, Nenagh to a discharge point on the Nenagh River located immediately up-stream of Tyone Bridge, Nenagh on the R498 Thurles Road. The proposed outfall pipeline installation shall be routed from a new pump sump installation within the waste water treatment plant site across agricultural lands in the townlands of Knockanpierce and Farnamurry and then along a section of the Ballygraigue Road to its junction with the R498 Thurles Road and from there, along the R498 Thurles Road to the entrance to the Arrabawn Co-op Homevalue Store site at Tyone, Nenagh from where it will extend across a grassed area to the discharge point on the Nenagh River. The overall length of the proposed pipeline shall be approximately 1.25 kilometres. A Natura Impact Statement (NIS) in respect of the proposed development will be submitted to the Planning Authority with the application. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 0791- 03) is held
Development Address: Arrabawn Co-Operative Society Ltd, Lands at Knockanpierce, Farnamurry & Tyone, Nenagh, Co. Tipperary
Architect Name: Location Key: Knockanpierce, Farnamurry & Tyone,
Electoral Division: Planner: Sara Jane Condon
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Yes Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 09/09/2024 Manager Order:
Decision Type: Conditional Number of Conditions: 8
Grant Date: 13/10/2024 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 12/10/2029
Decision Description: the installation of an underground pumped outfall pipeline for the conveyance of cooling water, condensate and treated effluent from their existing waste water treatment plant site at Knockanpierce, Nenagh to a discharge point on the Nenagh River located immediately up-stream of Tyone Bridge, Nenagh on the R498 Thurles Road. The proposed outfall pipeline installation shall be routed from a new pump sump installation within the waste water treatment plant site across agricultural lands in the townlands of Knockanpierce and Farnamurry and then along a section of the Ballygraigue Road to its junction with the R498 Thurles Road and from there, along the R498 Thurles Road to the entrance to the Arrabawn Co-op Homevalue Store site at Tyone, Nenagh from where it will extend across a grassed area to the discharge point on the Nenagh River. The overall length of the proposed pipeline shall be approximately 1.25 kilometres. A Natura Impact Statement (NIS) in respect of the proposed development will be submitted to the Planning Authority with the application. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 0791- 03) is held

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: