Planning Application: 2460337 (Tipperary County Council )
File Number:
2460337
Application Type:
PERMISSION
Planning Status:
APPEALED
Received Date:
03/05/2024
Decision Due Date:
27/06/2024
Validated Date:
03/05/2024
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/06/2024
Leave to Appeal:
Appeal Date:
19/07/2024
Commenced Date:
Submissions By:
06/06/2024
Applicant Details
Applicant name:
Kilsaran Concrete Unlimited Company
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(1) the provision of a 2,416 square metre defined recycling area in the pit floor; (2) the processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant; (3) stockpiling of waste concrete prior to processing and (4) stockpiling of recycled aggregates prior to transport off-site for use in construction works
Development Address:
Deerpark, Kilfeacle, Co. Tipperary
Architect Name:
Location Key:
Deerpark, Kilfeacle
Electoral Division:
Planner:
Lauren Butler Ryan
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
25/06/2024
Manager Order:
Decision Type:
Conditional
Number of Conditions:
10
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
(1) the provision of a 2,416 square metre defined recycling area in the pit floor; (2) the processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant; (3) stockpiling of waste concrete prior to processing and (4) stockpiling of recycled aggregates prior to transport off-site for use in construction works
extension to quarry, retention of office block and ancillary works at the entrance including weighbridge and cabin, retention of the truck repair / maintenance building, retention of the first aid / canteen building and retention of ready mix plant and machinery
Deerpark, Kilfeacle & Knockballynoe East Townslands Kilfeacle
continued use of previously permitted development under Ref No 04/968 & P.3.8382 & the grant of Substitute Consent Ref SU23.SU0005, including existing quarry, stone extraction & processing, concrete manufacturing facility, & related ancillary buildings & facilities. Permission for extension to existing quarry area by c.8.4h to give an overall extraction footprint of c.17.1h. The final quarry floor level will be similar to that of the existing quarry void, @ c.73mOD. Permission for construction of a new concrete block batching plant & associated production slab measuring 9800m2. Permission for replacement of exisitng septic tank adjacent to weighbridge site office with a proprietary effluent treatment system(new septic tank & modular puraflo). New electricity substation comprising of supplyroom & switchroom. Increase production output from quarry, from 150,000 tonnes pa to 250,000 tonnes pa, in line with market demand & all assoc site works within an overall application area of 32.5h, & all for a period of 25 years. An Environmental Impact Statement has been submitted
Deerpark, Kilfeacle & Knockballynoe East Townslands Kilfeacle
continued use of previously permitted development under Ref No 04/968 & P.3.8382 & the grant of Substitute Consent Ref SU23.SU0005, including existing quarry, stone extraction & processing, concrete manufacturing facility, & related ancillary buildings & facilities. Permission for extension to existing quarry area by c.8.4h to give an overall extraction footprint of c.17.1h. The final quarry floor level will be similar to that of the existing quarry void, @ c.73mOD. Permission for construction of a new concrete block batching plant & associated production slab measuring 9800m2. Permission for replacement of exisitng septic tank adjacent to weighbridge site office with a proprietary effluent treatment system(new septic tank & modular puraflo). New electricity substation comprising of supplyroom & switchroom. Increase production output from quarry, from 150,000 tonnes pa to 250,000 tonnes pa, in line with market demand & all assoc site works within an overall application area of 32.5h, & all for a period of 25 years. An Environmental Impact Statement has been submitted
(a) construction of a steel framed lime storage shed (11.96m high with a gross floor area of 400m2); (b) new single storey rear and side extension to existing site office building (new additional gross floor area of 88.9m2, total combined gross floor area of 131.5m2) consisting of office and welfare facilities; (c) all ancillary works