The Square and Barrack Street Fethard Co. Tipperary
a) alterations and extension to existing three storey building, which currently contains first and second floor living accommodation over ground floor retail unit. The works will consist of the change of use of the building to offices with elevational and internal layout alterations, construction of single and three storey extensions to side and rear, with demolition of existing rear single storey extension, b) demolition of existing garden shed, c) alteration to existing vehicular entrance and reconstruction of stone boundary wall to Barrack Street, d) hard surfacing for car parking, paths, and patios, e) construction of fenced enclosures for services and bin store e) re-grading of footpath locally along the building frontage on The Square, f) construction of 2 no. two-storey semi-detached dwellings on the site with frontage to Barrack Street, g) all associated site development works including on-site construction of drains and services, and connection to public drains and services, and construction of dividing walls and fence within the site. The application site forms part of Recorded Protected Structure reference number S645 Fethard Town Walls
No Environment Impact Assesments Associated with this Application