Planning Application: 20394 (Waterford City and County Council )
File Number:
20394
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
25/06/2020
Decision Due Date:
26/05/2021
Validated Date:
25/06/2020
Invalidated Date:
Further Info Requested:
18/08/2020
Further Info Received:
19/03/2021
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/05/2021
Leave to Appeal:
Appeal Date:
21/06/2021
Commenced Date:
Submissions By:
05/05/2021
Applicant Details
Applicant name:
Fenor Pig Farms Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
demolition of existing pig houses, associated buildings and slurry stores and construct a 960 sow integrated pig farm (birth to slaughter) consisting of seven pig houses, associated slurry tanks, a covered pig loading race, a feed mixing shed, a feed mill and workshop building, an electricity control building, a building with office, canteen, showers and WC, a waste water treatment system, and associated site works (OS Map Sheets 5691-D, 5762-B, National Grid Ref: 618800 609000). The site of the proposed development has an IPPC License Ref No. PO414-01. An Appropriate Assessment Screening and Natural Impact Statement Report and Environmental Impact Assessment Report are being submitted with this planning application.
demolition of existing pig houses, associated buildings and slurry stores and construct a 960 sow integrated pig farm (birth to slaughter) consisting of seven pig houses, associated slurry tanks, a covered pig loading race, a feed mixing shed, a feed mill and workshop building, an electricity control building, a building with office, canteen, showers and WC, a waste water treatment system, and associated site works (OS Map Sheets 5691-D, 5762-B, National Grid Ref: 618800 609000). The site of the proposed development has an IPPC License Ref No. PO414-01. An Appropriate Assessment Screening and Natural Impact Statement Report and Environmental Impact Assessment Report are being submitted with this planning application.