Planning application details ref: 2360089 Waterford City and County Council

100%100% Complete (warning)

Planning Application: 2360089 (Waterford City and County Council )
File Number: 2360089
Application Type: PERMISSION Planning Status: APPEALED
Received Date: 10/03/2023 Decision Due Date: 04/05/2023
Validated Date: 10/03/2023 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 03/05/2023
Leave to Appeal: Appeal Date: 24/05/2023
Commenced Date: Submissions By: 13/04/2023

Applicant Details

Applicant name: BNRG Mothel Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: A Solar Farm on a total site area of 141 hectares (ha), consisting of photovoltaic panels on ground mounted steel frames with associated cabling and ducting; 28 no. single storey inverter stations; perimeter fencing; permeable gravel access track; 49 no. onsite pole mounted CCTV cameras; 4 no. new site accesses; 4 no. security gates; 3 no. temporary construction compound/material storage area; 3 no. temporary construction stage wheelwash systems (with overhead settlement tank); 6 no. temporary storage containers and all associated ancillary development services and works
Development Address: The townlands of Bishopstown, Bridgetown, Ballyhest and Ballyneal., Co. Waterford, Ireland
Architect Name: Location Key: BISHOPSTOWN, BRIDGETOWN, BALLYHEST,
Electoral Division: Planner: ANNE DOYLE
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 03/05/2023 Manager Order: 2023/1185
Decision Type: Conditional Number of Conditions: 22
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: A Solar Farm on a total site area of 141 hectares (ha), consisting of photovoltaic panels on ground mounted steel frames with associated cabling and ducting; 28 no. single storey inverter stations; perimeter fencing; permeable gravel access track; 49 no. onsite pole mounted CCTV cameras; 4 no. new site accesses; 4 no. security gates; 3 no. temporary construction compound/material storage area; 3 no. temporary construction stage wheelwash systems (with overhead settlement tank); 6 no. temporary storage containers and all associated ancillary development services and works

Appeal Details


Appeal Details
Notification Date: 12/06/2023 BP Reference #: ABP-317188-23
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 09/07/2023 Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: