Planning Application: 2360089 (Waterford City and County Council )
File Number:
2360089
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
10/03/2023
Decision Due Date:
04/05/2023
Validated Date:
10/03/2023
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
03/05/2023
Leave to Appeal:
Appeal Date:
24/05/2023
Commenced Date:
Submissions By:
13/04/2023
Applicant Details
Applicant name:
BNRG Mothel Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A Solar Farm on a total site area of 141 hectares (ha), consisting of photovoltaic panels on ground mounted steel frames with associated cabling and ducting; 28 no. single storey inverter stations; perimeter fencing; permeable gravel access track; 49 no. onsite pole mounted CCTV cameras; 4 no. new site accesses; 4 no. security gates; 3 no. temporary construction compound/material storage area; 3 no. temporary construction stage wheelwash systems (with overhead settlement tank); 6 no. temporary storage containers and all associated ancillary development services and works
Development Address:
The townlands of Bishopstown, Bridgetown, Ballyhest and Ballyneal., Co. Waterford, Ireland
Architect Name:
Location Key:
BISHOPSTOWN, BRIDGETOWN, BALLYHEST,
Electoral Division:
Planner:
ANNE DOYLE
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
03/05/2023
Manager Order:
2023/1185
Decision Type:
Conditional
Number of Conditions:
22
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
23/04/2029
Decision Description:
A Solar Farm on a total site area of 141 hectares (ha), consisting of photovoltaic panels on ground mounted steel frames with associated cabling and ducting; 28 no. single storey inverter stations; perimeter fencing; permeable gravel access track; 49 no. onsite pole mounted CCTV cameras; 4 no. new site accesses; 4 no. security gates; 3 no. temporary construction compound/material storage area; 3 no. temporary construction stage wheelwash systems (with overhead settlement tank); 6 no. temporary storage containers and all associated ancillary development services and works