Planning Application: 18822 (Wicklow County Council )
File Number:
18822
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
18/07/2018
Decision Due Date:
11/09/2018
Validated Date:
18/07/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
31/08/2018
Leave to Appeal:
Appeal Date:
21/09/2018
Commenced Date:
Submissions By:
21/08/2018
Applicant Details
Applicant name:
Barnaby Investments Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
single storey petrol filling station (465 sqm gross floor area) comprising a forecourt convenience shop with off licence (97 sqm), 2 no café / restaurant concession areas (64 sqm) with seating area (185 sqm), public toilets (40 sqm) and ancillary staff and store areas (79 sqm). The associated facilities within the site include 6 no fuel pumps with canopy over, external seating area, external childrens play area, car wash facility, air / water services and associated car parking (47 no spaces) and bicycle parking. Permission is also sought for building and canopy mounted signage and 1 no totem sign, boundary treatment, hard and soft landscaping & all assoc site and development works. The development will be accessed from a new road of 450 m in length connecting Boghall Road and the Southern Cross Road, providing separate access and egress points for the petrol filling station development. Revised access arrangements for existing development is proposed, which is currently accessed from Boghall Road at the northern end of the new road and provision has been made for future access points to undeveloped lands (subject to separate future planning applications). The new road comprises a single carriageway (6m) and will include cycle lanes (1.7m) on both sides and footpaths (2M) on both sides as well as crossings, drainage, lighting, landscaping & associated site and development works including reconfiguration and tie in works to the existing public roads at Boghall Road and Southern Cross Road. Traffic signals are proposed at the intersection of the link road and the Southern Cross Road to the south and the Boghall Road to the north. A security hut (10sqm) located to the north of the site is be demolished to accommodate the development
single storey petrol filling station (465 sqm gross floor area) comprising a forecourt convenience shop with off licence (97 sqm), 2 no café / restaurant concession areas (64 sqm) with seating area (185 sqm), public toilets (40 sqm) and ancillary staff and store areas (79 sqm). The associated facilities within the site include 6 no fuel pumps with canopy over, external seating area, external childrens play area, car wash facility, air / water services and associated car parking (47 no spaces) and bicycle parking. Permission is also sought for building and canopy mounted signage and 1 no totem sign, boundary treatment, hard and soft landscaping & all assoc site and development works. The development will be accessed from a new road of 450 m in length connecting Boghall Road and the Southern Cross Road, providing separate access and egress points for the petrol filling station development. Revised access arrangements for existing development is proposed, which is currently accessed from Boghall Road at the northern end of the new road and provision has been made for future access points to undeveloped lands (subject to separate future planning applications). The new road comprises a single carriageway (6m) and will include cycle lanes (1.7m) on both sides and footpaths (2M) on both sides as well as crossings, drainage, lighting, landscaping & associated site and development works including reconfiguration and tie in works to the existing public roads at Boghall Road and Southern Cross Road. Traffic signals are proposed at the intersection of the link road and the Southern Cross Road to the south and the Boghall Road to the north. A security hut (10sqm) located to the north of the site is be demolished to accommodate the development