Planning Application: 21677 (Wicklow County Council )
File Number:
21677
Application Type:
PERMISSION
Planning Status:
APPEALED
Received Date:
04/06/2021
Decision Due Date:
17/11/2021
Validated Date:
04/06/2021
Invalidated Date:
Further Info Requested:
28/07/2021
Further Info Received:
11/10/2021
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
15/11/2021
Leave to Appeal:
Appeal Date:
13/12/2021
Commenced Date:
Submissions By:
03/11/2021
Applicant Details
Applicant name:
Kish Renewables Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Development Address:
Kish Business Park, Clogga Road, Arklow, Co. Wicklow
Architect Name:
Location Key:
ARKLOW
Electoral Division:
Planner:
Holly O'Connor
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
3rd Party Appeal + 1st Party Appeal against Fin. Contrib. condition received by ABP on 13/12/2021.
Decision
Decision Date:
15/11/2021
Manager Order:
2049/2021
Decision Type:
Conditional
Number of Conditions:
10
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application