Planning Application: 2460205 (Carlow County Council )
File Number:
2460205
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
19/07/2024
Decision Due Date:
24/04/2025
Validated Date:
19/07/2024
Invalidated Date:
Further Info Requested:
12/09/2024
Further Info Received:
28/02/2025
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
24/04/2025
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
03/04/2025
Applicant Details
Applicant name:
Ballyloo Solar Farm Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
Development Address:
In the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland, County Carlow
Architect Name:
Location Key:
BALLYBAR
Electoral Division:
Planner:
Edwin O'Meara
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
24/04/2025
Manager Order:
36504
Decision Type:
Conditional
Number of Conditions:
36
Grant Date:
27/05/2025
Grant Managers Order #:
36504
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
26/05/2035
Decision Description:
A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
In the townlands of Ballybar Upper, Ballyloo, Ballyryan Garryhundon and Linkardstown County Carlow.
A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
No Environment Impact Assesments Associated with this Application