for a development consisting of the erection of a single turbine with a hub height of 100m and rotor diameter of 103m, overall height not exceeding 152m and all associated site development works, including foundations, crane hardstanding, access track and underground cabling. Also, the construction of 20kV switchroom building with a floor area 50sqm, and temporary alteration of existing factory entrance of the L30130.
Development Address:
Cloggagh,, Ballyjamesduff
Architect Name:
Location Key:
CLOGGAGH, BALLYJAMESDUFF
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Extension of time 23/04/2022
Decision
Decision Date:
27/02/2012
Manager Order:
PL 92,420
Decision Type:
Conditional
Number of Conditions:
11
Grant Date:
24/04/2012
Grant Managers Order #:
EOT
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
23/04/2022
Decision Description:
for a development consisting of the erection of a single turbine with a hub height of 100m and rotor diameter of 103m, overall height not exceeding 152m and all associated site development works, including foundations, crane hardstanding, access track and underground cabling. Also, the construction of 20kV switchroom building with a floor area 50sqm, and temporary alteration of existing factory entrance of the L30130.
EOT 11/296 for the erection of a single wind turbine and all associated site development works including foundations, crane hardstanding, access track and underground cabling