Planning Application: 045843 (Donegal County Council )
File Number:
045843
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
05/10/2004
Decision Due Date:
21/03/2005
Validated Date:
05/10/2004
Invalidated Date:
Further Info Requested:
19/11/2004
Further Info Received:
22/02/2005
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
11/03/2005
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
STAN MCWILLIAMS & BERENIC MAHER
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
ERECTION OF A SINGLE WIND TURBINE OF 57.75 METRES OF TOWER/HUB HEIGHT AND 71 METRES BLADE DIAMETER (GROUND TO BLADE HEIGHT OF 93.25 METRES) RING MAIN UNIT KIOSK, TURBINE HARDSTAND, ACCESS TRACK, DRAINAGE AND ALL ASSOCIATED WORKS AND ANCILLARY DEVELOPMENTS
ERECTION OF A SINGLE WIND TURBINE OF 57.75 METRES OF TOWER/HUB HEIGHT AND 71 METRES BLADE DIAMETER (GROUND TO BLADE HEIGHT OF 93.25 METRES) RING MAIN UNIT KIOSK, TURBINE HARDSTAND, ACCESS TRACK, DRAINAGE AND ALL ASSOCIATED WORKS AND ANCILLARY DEVELOPMENTS
EXTENSION TO AN APPROVED WIND FARM FOR A SINGLE 1.75 MW WIND TURBINE OF 60 METRES TOWER/HUB HEIGHT AND 66 METRES BLADE DIAMETER (GROUND TO BLADE- TIP HEIGHT OF 93METRES) TURBINE HARDSTAND ACCESS TRACK AND ALL ASSOCIATED WORKS AND ANCILLARY DEVELOPMENT
AMENDMENT TO AN APPROVED SINGLE WIND TURBINE HEIGHT (REF 04/5843) FOR A SINGLE WIND TURBINE TO 64.5 METRES TOWER/HUB HEIGHT (WITH A 71 METRE BLADE DIAMETER AS APPROVED) AND GROUND TO BLADE - TIP HEIGHT OF 100 METRES
FOR A NEW 10 YEAR PLANNING PERMISSION FOR A PROPOSED WIND TURBINE AND AN ELECTRICAL CONTROL BUILDING (ALREADY PERMITTED IN THE SAME LOCATION UNDER CURRENT VALID PLANNING PERMISSIONS REF 07/70231; 05/70095; 04/5843 & 04/5070 FOR A SINGLE WIND TURBINE AND ELECTRICAL CONTROL BUILDING). THE NOW PROPOSED WIND TURBINE WILL HAVE A STEEL TOWER AND COMPOSITE FIBRE ROTOR BLADE, IT WILL HAVE A HUB HEIGHT UP TO 80 METRES, A ROTOR BLADE DIAMETER OF 82 METRES, AND THUS A BLADE TIP HEIFHT OF 121 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES A WIND TURBINE TRANSFORMER;TURBINE HARDSTAND; ACCESS TRACK; DRAINAGE WORKS, INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACK; UNDERGROUND ELECTRICAL CABLES AND ALL ASSOCIATED SITE WORKS AND RELATED ANCILLARY DEVELOPMENT
No Environment Impact Assesments Associated with this Application